Original source · versioned page text
Attachment 3 - Response Letter
In conformity with The Noosa Plan 2020 - Sustainable Building Design Code, the development: 1. maximises water efficiency on site by incorporating rainwater collection and reuse measures for non-potable purposes such as irrigation (PO2). 2. The Development reduces stormwater run-off by minimising impervious areas and maximising site vegetation to absorb water on site. The only impervious areas are the driveway and car park beneath the new dwelling (PO3). Request no. 8 Stormwater pits The applicant's surveyor has surveyed the location of the stormwater pit on Ventura Street. Drawing 3951-A100 (Rev D) shows the location of stormwater lintel and the location of the driveway cross-over. The cross-over is designed to be 1.0 metre from the pit lintel. Request no. 9 Earthworks Plan AAA has produced an earthworks plan (drawing 3951-A114). The earthworks are limited to excavation of 34.40m3 of cut to allow for the construction of the garage for the new dwelling. The cut will be removed from site immediately, and the design does not anticipate any need for on-site storage piles. 10. Driveway access Drawing 3951-17A, and 3951-18 shows: (a) that the proposed driveway and crossover is generally in accordance with RS-049, RS-050 and associated addendum. However, it is noted that by engineering drawing 3951-17A and 3951-18 the driveway access for the proposed new lot along Ventura Street Sunrise Beach will not strictly meet the requirements in RS-049 and RS-050 for
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.