Skip to the record
The gold standard in government transparency.

Council archive · source document

Reference Document Erosion & Sediment Control Phase 1, 2 & 3 OPW19-0098 · OPW19/0098

of 2

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

           -
     NOOSA COUNCIL
REFERENCE DOCUMENT ONLY
  OPW19/0098 11 JUN 2019


[OCR of page images]
 

  
   
 

 

 

 

 

 

 

 

LIMIT OF CLEARING.

SEDIMENT FENCE IN ACCORDANCE
WITH IECA STO ORGS SF-01 & SF-02

[- PROVIDE ROCK LINED SUMP FOR PUMPING
(OUT TREATED WATER (1.0m DEEP)

 

 

  

BW, —> DwD aw

i
! %

 

 

 

 

 

 

 

 

 

 

 

     
  

     

 

 

 

 

        

 

    
 
     

OD —> DWO —& OWT —P D—B OWO —B OW —B DOWD —R OW —=B DWO <=» Di
‘ == N

 

INSTALL CONSTRUCTION ENTRYIEXIT IN
ACCORDANCE WITH IECA STD DRG EXIT-02

  
 
   
   
    
  
   
     

 

\
0 =P DAR —=> OND — OWS —B WD

 

  

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

     
  

 

 

 

      

 

 

 

 

      

    

 

 

 

    

   
      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

=
| 8
i a
t 2
f 8
I AREA UP TO RL. 4.00 TO BE USED 525
| AAS TEMPORARY SEOMENT BASIN oad
x OURING EARTHWORKS PHASE etitee
bg ac
~ +
7
‘ '
i
'
woe NOOSA COUNCIL
‘y FORNOTES REFER TO DRAWING Coot '
2. ANY FILLING REQUIRED WITHIN LOTS ASSOCIATED WMTH THE CONSTRUCTION AND
Sb omlssionnc oF Teuporany SEDIMENT BASINS I TOBE UNDERTAKEN WH REFERENCE DOCUMENT ONLY
LEVEL 1 GEOTECHNICAL SUPERUISION t
2. CONTRACTOR TO PREPARE CPESC CERTIFIED EROSION AND SEDIMENT CONTROL !
PLAN AND INSTALL AND MAINTAIN CONTROL THROUGHOUT THE COURSE OF WORKS | OPW19/0098 11 JUN 2019
'
PHASE 1 WORK (BULK EARTHWORKS) \
1 PRIOR TO IMPLEMENTING ERUSION AND SEDIMENT CONTROLS, CLEAN |
CATCHMENTS UPSTREAM MUST BE DIVERTED AROUND SUBJECT SITE AND
PROTECTED OF DOWNSTREAM CATCHMENTS MUST BE ESTABLISHED, CUT AND FIL !
BULK EARTHWORKS IS COMMENCED IN THIS STAGE, TEMPORARY SEOIMENT BASINS
TOBE CONSTRUCTED AND MAINTAINED RS WORK PROGREGSES
(OPTIONAL EARTH EMBANKMENT CLEAN WATER CALCULATIONS
‘ToRcREASE FLOW CAPACITY
‘000ne OND Soom MIN), | ARDVOR ACT AS FREEBOARD G2FLOW= 0014s > COEFFOFRUNOFF 08
INSTALL GEOPABRIC TO » INTENSITY (tc Smins) 160mnv/hr
INVERT (PINNED) > CATCHMENTARER oadora
‘SITE RP BOUNDARY PUREE 1 (MAX)
FOREN RP BOUNDARIES ESS BREESLERRNN (CHANNEL CHARACTERISTICS
EXISTING STORMWATER RRS RRR
RRARRRRRRR MANNINGS COEFF 0.025
EXISTING SEWER: — BED SLOPE 1 in 62.5 (1.60%)
EASTING WATER . LEFTBANK SLOPE tina
s. BED WIDTH 0.000m y
EXISTING CONTOUR (0.50m INTERNALS) 52 RIGHTBANK SLOPE tin2 3
PROPOSED CONTOUR MAJOR (1m INTERVALS) a G2FLOW = 0014's DEPTH OF a2 FLOW g
PROPOSED CONTOUR MAJOR (025m INTERVALS) vevocrry 2
PROPOSED EARTHWORKS PLATFORM YPICAL PROFILE OF CLEAN WATER DIVERSION DRAIN DV (depth * velocity) 3
PROPOSED TOP OF BANK ‘SCALE: 1-25 O22mF | P= 0.465 m | R (AP) °
— — — — propose Toe oF BANK
—+——_ PROPOSED TEMPORARY VEGETATION INSTALL 1.4m WADTH
PROTECTION FENCING GEOFABRIC TORVERT DIRTY WATER CALCULATIONS
ae EXTENTOF VEGETATION einen) fe 00mm Qa Q2FLOW= 460m: > COEFFOFRUNOFF 08
2 > INTENSITY leSmans) 160mm
Be > CATCHMENT AREA” 000Ha
[DJ enosoare surren zone iREcTION 2 BATTER GRADE
OF INFLOW 4 HORRRRISY (wan)
ann KERR MANNINGS FORMULA Q=AKRM”x S185 9"
EJ RRR RRA
ENVIRONMENTAL BUFFER ZONE RRR _ ORRIN (CHANNEL CHARACTERISTICS
a ING MANNING'S COEFF 0.025
TEMPORARY SEDIMENT BASIN BED SLOPE tin9 (145%)
{eer Ban stoPe
on beo wos 2.a00m
(prego earriworns RIGHTBANK SLOPE tin? -
moma SEDIMENT FENCE .
Seer ree nos sri asro2 Q2FLOW = O4€0mP!s DEPTHOFa2FLOW —0.478m
OIRTY WATER DIVERSION BUND Drv (env ton L--
om > DV (doth “velo -
REFER IECA STD DRGS DB.01 AND C004 YPICAL PROFILE OF DIRTY WATER DIVERSION BUND (Gon \ i
CLEAN WATER DIVERSION DRAIN EE 296 n? | P*7.T70m | R(AP)=0038m) \ !
> ovo a REFERIEGA STO DRes BO-eT AND Coe '
REFER DRAWING NO 18556-P001 FOR PROJECT NOTES
Connon “sociiod Cones Gen Dawn Vortoa Proper raving Te Tar soo S|
ri eg ett a oR
copyright accordance wih the 64 GATEWAY DRIVE PTY LTD a So 64 GATEWAY DRIVE, NOOSAVILLE |BULK EARTHWORKS 1: 250 Al
ensuing pty ae) anaes sun GA oR EROSION & SEDIMENT CONTROL Drawing Number
st ng at me a oR
seo ts spect pec martoo is engineers & project managers |*7"-"" Laas ToT 3 ONSPITO25 PHASE 1 18556-C004
Ths aving shal pet be sed consulting (Nese O75 9000 LOCAL AUTHORITY NOOSA COUNCIL
fr consucton unt marad tanpmie ann 788, wa 9 460297 Sioned, MCU APPROVAL HORIZ DATUM. LOCAL ° Sheet Revision
Veeevtreondctor mine |-A_[ DORE] OPW APPLICATION = Ses: Beer seaen ceiltnategcon ROLAPPROVAL VERTOATUM. AKO 4of5 A
evo rere iRev| Date | Revision Description Diawn| _aneee"  Reaneits a 250419 | OPWAPPROVAL RLDATUM PSM 19290
A
Full text of the other 1 page

Page 2

           -
     NOOSA COUNCIL
REFERENCE DOCUMENT ONLY
  OPW19/0098 11 JUN 2019


[OCR of page images]
 

  
  
  
 
 
  
  
    
 
     
   

SEDIMENT FENCE IN ACCORDANCE
S WITH IECA STO ORGS SF-01 & SF-02
LIMIT OF CLEARING

 

   
  

\
. { OHO —P OW — DWE DIE DWO —B DD = OW —h OWD —B OW —=w DvD <PrD
\ 2 N
‘e, \
\

ROCK WEIR REMOVED AS
PART OF STAGE 3 ESC WORKS

 
 

  

BUND REMOVED AS PART OF
STAGE 3 ESC WORKS.

      

INSTALL CONSTRUCTION ENTRYIEXIT IN
ACCORDANCE WITH IECA STD DRG EXIT-02

   

     

 

% Ser

       
     
  
     

 

DISTURBED AREAS TO BE TOPSOILED AND ‘TEMPORARY SEDIMENTARY
HYDROMULCHED ON COMPLETION OF BASIN AREA TOBE ~
EARTHWORKS OR COVERED WITH MULCH IF SSTABILISED FOLLOWING ~
BUILDING ACTIVITY IMMINENT (= 3 MONTHS) COMPLETION EARTHWORKS &

 

JOINS BELOW

  

 

(CLEAN WATER DIVERSION
DRAIN REMOVED AS PART OF
STAGE 3 ESC WORKS

    

 

 

 

 

 

 

 

  

NOOSA COUNCIL !
REFERENCE DOCUMENT ONLY || |
OPW19/0098 11 JUN 2019

 

NOTES

41, FOR NOTES REFER TO DRAWING C091

2. ANY FILLING REQUIRED IMTHIN LOTS ASSOCIATED WITH THE CONSTRUCTION AND
DECOMMISSIONING OF TEMPORARY SEDIMENT BASINS |S TO BE UNDERTAKEN WITH
LEVEL 1 GEOTECHNICAL SUPERVISION

3, CONTRACTOR TO PREPARE CPESC CERTIFIED EROSION AND SEDIMENT CONTROL
PLAN AND INSTALL AND MAINTAIN CONTROL THROUGHOUT THE COURSE OF WORKS

 

 

WEIR CALCULATIONS PHASE 2 WORK (TEMP SEDIMENT BASIN RESTORATION
1, ALLTEMP SEDIMENT BASINS TO BE FILLED UNDER LEVEL 1 SUPERVISION AND ALL
QIOWEIR FLOW = 0.382 m7 > COEFF OF RUNOFF 0.7 DISTURBED AREAS STABILISED, WHEN DIRECTED BY A SUPERVISING ENGINEER

> INTENSITY (te Smins) | 225mevhe
> CATCHMENT AREA 0.873Ha PHASE 3 WORK (CIVIL COMPLETION)
1. UPON COMPLETION OF ALL CONSTRUCTION, BATTERS ARE TO BE TURFED LEAVING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pistance | ever | FLOW | AVERAGE | FLOWIN ‘THE SEDIMENT FENCES TO CONTROL SEDIMENT AND STORMWATER RUNOFF.
vepTH | oEPTH | SECTION ‘STORMWATER RUNOFF TO PIPED SYSTEM, ROOF WATER PIT AND GULLY ROAD PIT,
om oy , o (mrs) ‘SEDIMENT BARRIERS ADDED

LEGEND 00 4.900 0.000 5 5 2. REMOVE TEMPORARY DIRTY WATER DIVERSION BUND AND CLEAN WATER
— 70 4.000 0.079 oa oo DIVERSION DRAIN, w
SITE RP BOUNDARY Th 500 oT as oa 3. REMOVE ROCK LINED WEIR FOLLOWING STABILISATION OF TEMPORARY BASIN, 3
44__ STABILISE AREA WHERE ROCK LINED WEIR WAS LOCATED, 3
ADJACENT RP BOUNDARIES 120 4300 0.000 2.040 oor 2
EXISTING STORMWATER ToTALWERFLOW [0382 g
EXISTING SEWER WATERLEVELATWEIR. RL4079 8

   
 
   
 
 

     

   

     
         

 

 

 

 

   
 

EXISTING WATER NO
EASTING CONTOUR @.50m NTERNALS) DRY WATER OVERGION | f
PROPOEED CONTOUR MANA (Om TERVALS) Earn
Propoemn Each PLATrora 3 [
PROPOSED TOP OF BANK WEIR LEVEL RL 4.0 _—! weir ever iso
AREA OF Exe RRS
REFER IECA STD DRGS SF-01 & SF-02 = =
=> ow amp DIRTY WATER DIVERSION BUND TO FORM A DENSE, WELL-GRADED MASS WITH MINIMUM REFER DETAIL FORROCKDETALS =
CLEAN WATER DVERSION DRAIN WOIDS, TO A THICKNESS OF 200m. ‘SURFACE
ro
Le
ROCK LINED WEIR ELEVATION SECTION \
NOT TO SCALE NOT TO SCALE |

REFER DRAWING NO 18556-P001 FOR PROJECT NOTES.

 

 

 

 

 

 

Spica 64 GATEWAY DRIVE PTY LTD R < DR 64 GATEWAY DRIVE, NOOSAVILLE_ |BULK EARTHWORKS 1:250 | At
re i & oR EROSION & SEDIMENT CONTROL _ [ossmanaroe

 

 

 

 

 

 

  

 

 

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

seaor ts peat ject martoo = engineers& projectmanagers [78.5 Sora” ROP, LOT 3 ON SPITO295 PHASE 2 &3 18556-C005
This dein shall not bo sed onsuttng oan 7 48 800 oR ore LOCAL AUTHORITY NOOSA COUNCIL

fr constructon unt marked 3 toon planars® ithe 700810, Macy 1 40207 Stones MCU APPROVAL HORIZ DATUM LOCAL 0 Sheet Revision
insuedforeonsrucion mths” [_A [250076] OPW APPLICATION F ben designs ESR eseingcom wong ROL APPROVAL VERT DATUM AHO (lalaadlahal 5S ofS A
revision desorption [Rev] Date | Revision Description Drawn] + surveyors: parrot Yet [cikediatentand 26.04.19 | OPW APPROVAL RL DATUM, PSM 13296 [MEASUREMENT BAR ~ INCREMENTS Biman

 

 

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document Erosion & Sediment Control Phase 1, 2 & 3 OPW19-0098.pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.