Council archive · source document
Reference Document Erosion & Sediment Control Phase 1, 2 & 3 OPW19-0098 · OPW19/0098
-
NOOSA COUNCIL
REFERENCE DOCUMENT ONLY
OPW19/0098 11 JUN 2019
[OCR of page images]
SEDIMENT FENCE IN ACCORDANCE
S WITH IECA STO ORGS SF-01 & SF-02
LIMIT OF CLEARING
\
. { OHO —P OW — DWE DIE DWO —B DD = OW —h OWD —B OW —=w DvD <PrD
\ 2 N
‘e, \
\
ROCK WEIR REMOVED AS
PART OF STAGE 3 ESC WORKS
BUND REMOVED AS PART OF
STAGE 3 ESC WORKS.
INSTALL CONSTRUCTION ENTRYIEXIT IN
ACCORDANCE WITH IECA STD DRG EXIT-02
% Ser
DISTURBED AREAS TO BE TOPSOILED AND ‘TEMPORARY SEDIMENTARY
HYDROMULCHED ON COMPLETION OF BASIN AREA TOBE ~
EARTHWORKS OR COVERED WITH MULCH IF SSTABILISED FOLLOWING ~
BUILDING ACTIVITY IMMINENT (= 3 MONTHS) COMPLETION EARTHWORKS &
JOINS BELOW
(CLEAN WATER DIVERSION
DRAIN REMOVED AS PART OF
STAGE 3 ESC WORKS
NOOSA COUNCIL !
REFERENCE DOCUMENT ONLY || |
OPW19/0098 11 JUN 2019
NOTES
41, FOR NOTES REFER TO DRAWING C091
2. ANY FILLING REQUIRED IMTHIN LOTS ASSOCIATED WITH THE CONSTRUCTION AND
DECOMMISSIONING OF TEMPORARY SEDIMENT BASINS |S TO BE UNDERTAKEN WITH
LEVEL 1 GEOTECHNICAL SUPERVISION
3, CONTRACTOR TO PREPARE CPESC CERTIFIED EROSION AND SEDIMENT CONTROL
PLAN AND INSTALL AND MAINTAIN CONTROL THROUGHOUT THE COURSE OF WORKS
WEIR CALCULATIONS PHASE 2 WORK (TEMP SEDIMENT BASIN RESTORATION
1, ALLTEMP SEDIMENT BASINS TO BE FILLED UNDER LEVEL 1 SUPERVISION AND ALL
QIOWEIR FLOW = 0.382 m7 > COEFF OF RUNOFF 0.7 DISTURBED AREAS STABILISED, WHEN DIRECTED BY A SUPERVISING ENGINEER
> INTENSITY (te Smins) | 225mevhe
> CATCHMENT AREA 0.873Ha PHASE 3 WORK (CIVIL COMPLETION)
1. UPON COMPLETION OF ALL CONSTRUCTION, BATTERS ARE TO BE TURFED LEAVING
pistance | ever | FLOW | AVERAGE | FLOWIN ‘THE SEDIMENT FENCES TO CONTROL SEDIMENT AND STORMWATER RUNOFF.
vepTH | oEPTH | SECTION ‘STORMWATER RUNOFF TO PIPED SYSTEM, ROOF WATER PIT AND GULLY ROAD PIT,
om oy , o (mrs) ‘SEDIMENT BARRIERS ADDED
LEGEND 00 4.900 0.000 5 5 2. REMOVE TEMPORARY DIRTY WATER DIVERSION BUND AND CLEAN WATER
— 70 4.000 0.079 oa oo DIVERSION DRAIN, w
SITE RP BOUNDARY Th 500 oT as oa 3. REMOVE ROCK LINED WEIR FOLLOWING STABILISATION OF TEMPORARY BASIN, 3
44__ STABILISE AREA WHERE ROCK LINED WEIR WAS LOCATED, 3
ADJACENT RP BOUNDARIES 120 4300 0.000 2.040 oor 2
EXISTING STORMWATER ToTALWERFLOW [0382 g
EXISTING SEWER WATERLEVELATWEIR. RL4079 8
EXISTING WATER NO
EASTING CONTOUR @.50m NTERNALS) DRY WATER OVERGION | f
PROPOEED CONTOUR MANA (Om TERVALS) Earn
Propoemn Each PLATrora 3 [
PROPOSED TOP OF BANK WEIR LEVEL RL 4.0 _—! weir ever iso
AREA OF Exe RRS
REFER IECA STD DRGS SF-01 & SF-02 = =
=> ow amp DIRTY WATER DIVERSION BUND TO FORM A DENSE, WELL-GRADED MASS WITH MINIMUM REFER DETAIL FORROCKDETALS =
CLEAN WATER DVERSION DRAIN WOIDS, TO A THICKNESS OF 200m. ‘SURFACE
ro
Le
ROCK LINED WEIR ELEVATION SECTION \
NOT TO SCALE NOT TO SCALE |
REFER DRAWING NO 18556-P001 FOR PROJECT NOTES.
Spica 64 GATEWAY DRIVE PTY LTD R < DR 64 GATEWAY DRIVE, NOOSAVILLE_ |BULK EARTHWORKS 1:250 | At
re i & oR EROSION & SEDIMENT CONTROL _ [ossmanaroe
seaor ts peat ject martoo = engineers& projectmanagers [78.5 Sora” ROP, LOT 3 ON SPITO295 PHASE 2 &3 18556-C005
This dein shall not bo sed onsuttng oan 7 48 800 oR ore LOCAL AUTHORITY NOOSA COUNCIL
fr constructon unt marked 3 toon planars® ithe 700810, Macy 1 40207 Stones MCU APPROVAL HORIZ DATUM LOCAL 0 Sheet Revision
insuedforeonsrucion mths” [_A [250076] OPW APPLICATION F ben designs ESR eseingcom wong ROL APPROVAL VERT DATUM AHO (lalaadlahal 5S ofS A
revision desorption [Rev] Date | Revision Description Drawn] + surveyors: parrot Yet [cikediatentand 26.04.19 | OPW APPROVAL RL DATUM, PSM 13296 [MEASUREMENT BAR ~ INCREMENTS Biman
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document Erosion & Sediment Control Phase 1, 2 & 3 OPW19-0098.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.