RFI - 20220156 Kauri St SWMP Rev B
Figure 4.4 - Ecosol Litter Basket Pollutant Removal Efficiencies
4.2.1.2. Bioretention Areas
An end of line bioretention area will provide treatment to all stormwater runoff captured within the internal
drainage network before it is discharged from the development.
The bioretention area will not be lined to allow for run-off to be infiltrated into the soils for disposal and ground
water replenishment. A geotechnical analysis of the proposed bioretention garden location consisting of soil
boreholes and falling head soil permeability tests has identified that the soils have a Ksat value of 0.0998cm/min,
equivalent to 59.88mm/hr (indicative of a sandy clay) which is used to represent the exfiltration rates into the
surrounding soils from the garden. Refer to Appendix C Soil Borehole Data & Permeability Calculations for details
of these calculations.
The bioretention areas are modelled in accordance with the Water by Design MUSIC Guidelines 2018 with the
node configuration shown below in Figure 4.5 – Bioretention Node details.
Project number 20220156 Page 15 of 27
File RECOR Stormwater Management Report - 20220156.docx, 2022-10-28 Revision 1
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.