BA250052 Architectural
Attached to the e-mail Generally in Accordance - Revised Design - MCU21/0150.02.
J1 - 75X50 F14 HWD H3 @ 450 MAX CNTRS
B1 - 75X50 F14 HWD H3
DECKING BOARDS - 140X19 MERBAU
NOTE: FINAL RAMP AND LANDING
DECKING FRAME FIXED TOGETHER
HEIGHTS AND LENGTHS TO BE
WITH BATTEN SCREWS. PACKERS
DETERMINED ON SITE ONCE
INSTALLED BETWEEN FRAME
ENTRY DOOR INSTALLED.
AND SLAB FOR WEATHERPROOFING.
TIE DOWN FRAME TO SLAB WITH BRACKETS
USING CONCRETE ANCHORS.
2660 APPROX
TO BE CONFIRMED WITH FINAL REBATE DOOR SILL
DECK LANDING HEIGHT ON SITE DECK LANDING MAX 10MM INTO SLAB
INSTALL TERMITE PROTECTION
190 APPROX
80 APPROX
SETDOWN AREA
2070
BETWEEN SLABS/LANDING
DECK LANDING
B1
TO VERANDAH
J1
B1
G.F.L
100
G.L
CARPARKING AREA MAX 1:14 GRADE VERANDAH SLAB
IN FRONT OF RAMP TO PATH
GRADE 1:40 MAX CREATE DIRT PAD TO 100MM UNDER
1200
TOP OF VERANDAH SLAB
LANDING FRAMEWORK RAMP DETAIL TO VERANDAH LANDING
PLAN VIEW 1:50 SIDE VIEW 1:50
FOR CONSTRUCTION
Rev No. Description Date
1 Concept Floor Plan 12/08/2024 Client: Sophie McLaren
RAMP & LANDING DETAIL
22/11/2024 12:13:20 PM
2 Concept Plans Selections 23/08/2024 Description: New Dwelling
3 Preliminary Working Drawings 28/08/2024 Project number 6335
4 For Construction 3/10/2024
5 For Construction - Lodgement 15/10/2024 Site Address: 9 Rules Rd Pomona Qld Date 12/08/2024 A107.02
6 For Construction - Contract 18/11/2024 Drawn by T.D
© QBCC Lic no. 15187645 Checked by T.D Scale 1 : 50
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original