Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

BA250052 Architectural

Attached to the e-mail Generally in Accordance - Revised Design - MCU21/0150.02.

of 23

Page text shows just the words. Original shows the document exactly as it was published.

SITE NOTES:
Meter box location                                                                                                                                                                                                                                                 PROPERTY DESCRIPTION
to be verified by builder on site.

UNDERGROUND SERVICES                                                                                                                       BAL RATING 19.                                                                                                          Lot 190 on MCH1261
Contact should be made to the relevant
authority for detailed location of all                                                                                                     SOIL CLASS 'M' SITE                                                                                                     Local Govt: NOOSA COUNCIL
underground services prior to any demolition,                                                                                                                                                                                                                      Locality: POMONA
excavation or construction on this site.
                                                                                                                                           WIND CLASS - N3.                                                                                                        Area: 15831.89m2
PROPERTY BOUNDARIES
Verify all bearing and dimensions on site prior
to any construction.
                                                                                                                                                                                                                                  EXISTING DRIVEWAY
SITE PREPARATION                                                                                                                        Existing        Existing                          5000
SITE PREPARATION - CLEAR VEGETATION FOLLOWED                                                                                            effluent        septic
                                                                                                          139.574m                      area            tank                                        179° 35' 00"
BY EXCAVATION OF TOP SOIL AND MATERIAL TO SUIT




                                                                                                                                                                                 10000
FINAL DESIGN LEVELS.




                                                                                                                                                                                         OMP
                                                                                                                                                                                                                   EXISTING
CUT AND FILL BATTERS NOT TO EXCEED A MAXIMUM
                                                                                                                                                            Proposed                                               SHED
SLOPE AS PER NCC VOL 2 2022 PART 3.2 EARTHWORKS                                                                                                                                                           MB
PART 3.2.1 FOR THE SITE SPECIFIC SOIL.                                                                                                                      Dwelling
ENSURE BUILDING PLATFORM IS PROOF ROLLED TO
                                                                                                                                                   ST                                               9x8                                          SERVICES ALLOWANCE:
                                                                                                                                                                            HW                                 19
OBTAIN A FIRM FOUNDATION BASE TO SUPPORT SLABS                                                                                                                                                                    69
                                                                                                                                                                                                                    8




                                                                                    90° 00' 00"
                                                                                                                                                                                                                                                 ELECTRICAL: ALL NEW WIRING TO NEW




                                                                                                                                                                     3200
AND FOOTING LOADS. ALL FOOTINGS TO BE DEEPENED




                                                                                                                                                                                                                                  RD
                                                                                                                                                                            Min
THROUGH ANY SOFT SPOTS TO BEAR INTO NATURAL                                                                                                         1200w Concrete                                       Existing water
GROUND OR CERTIFIED COMPACTED FILL MATERIAL. A MIN                                                                                                  path ramp
                                                                                                                                                                                                         tanks Total 45000L
                                                                                                                                                                                                                                                 DWELLING INCLUDING MATERIALS AND




                                                                                                                                                                                                                                   S
300MM.                                                                                                                                              to front entry
                                                                                                                                                                                 5400          Carparking                                        FIXTURES. NEW SUB-BOARD INSTALLED




                                                                                                                                                                                                                                LE
ALL LOOSE MATERIAL AND WATER SHALL BE CLEANED                                                                                                       deck landing
                                                                                                                                                                                               space option                                      INTERNALLY TO NEW DWELLING WITH




                                                                                                                                                                                                                       0"
                                                                                                                                                                                   Min




                                                                                                                                                                                                                   5' 0
OUT OF FOOTING EXCAVATIONS PRIOR TO CONCRETE




                                                                                                                                                                                                                              RU
                                                                                                                                                                                               Max gradient
PLACEMENT.                                                                                                                                                                                                                                       CONDUIT UNDER SLAB FOR MAINS




                                                                                                                                                                                                                 °2
                                                                                                                                                                                               1:40
ALL NEW FOOTING SYSTEMS ARE TO BE DEEPENED TO                                                                                                                                                                                                    CONNECTION.




                                                                                                                                                                                                               119
BEAR BELOW ZONE OF INFLUENCE OF EXISTING STRUCTURES.
THE CUT/FILL LINE IS APPROXIMATE ONLY. IF THE POSITION
OF THE ACTUAL CUT/FILL LINES VARIES - REFER TO ENGINEER                                                                                                                                                                                          CLIENT TO PROVIDE LEAD IN, MAINS
FOR CONFIRMATION OF FOOTING DETAILS.
                                                                                                                                                            Existing                                                                             CONNECTION AND EARTHING TO
                                                                                                                                                            Clearance area (3800m2)                                                              ONSITE OFFGRID SOLAR SYSTEM.
SURFACE WATER
                                                                                                                                                                                                                                                 CLIENT TO PROVIDE SPECIFICATION
DIRECT ALL SURFACE WATER AWAY FROM                                                                                                                                                                                                               FOR SUB-MAINS AC CIRCUIT BREAKER
ADJOINING BUILDINGS AND NEW BUILDING.
GROUND SURFACE TO BE SLOPED MIN 1:20                                                                                                                                                                                                             REQUIRED FOR OUR INSTALL INTO NEW
AWAY FROM BUILDINGS FOR 900mm MIN AND                                                                                                                                                                                                            DWELLING




                                                                                                                                NORTH
TO A POINT THAT AVOIDS PONDING NEAR
BUILDING.
                                                                                                                                                                                                                                                 SUB-BOARD.
STORMWATER
                                                                                                                                                                                                                                                 PLUMBING: CLIENT TO UNDERTAKE
ROOF WATER TO STREET KERB OR                                                                                                                                                                                                                     ALL PLUMBING AND GAS WORKS
TO COUNCIL APPROVED SYSTEM.                                                                                                                                                                                                                      INCLUDING LABOUR AND MATERIALS
ALL DOWNPIPES TO BE 90mm DIAMETER                                                                                                                                                                                                                FOR UNDERSLAB WORKS, ROUGH IN,
TO STORMWATER PIPES IN ACCORDANCE
WITH A.S. 3500.3 & TO DISPURSE 125m2 MAX
                                                                                                                                                                                                                                                 FIT OFF AND CONNECTIONS TO ON SITE
ROOF AREA                                                                                                                                                                                                                                        EXISTING WATERTANKS AND SEPTIC
PLUMBING                                                                                                                                                                                                                                         SYSTEM AND NEW GAS SERVICES.
PLUMBING LAYOUT DIAGRAMMATICAL
ONLY. LICENCED PLUMBER TO CONFIRM
ALL PLUMBING AND VENTING ON SITE.
PLUMBER & DRAINER INSTALLATION TO COMPLY
                                                                                  168.358m




WITH THE STANDARD PLUMBING & DRAINAGE                                                                                                                                                                                                                                                     SITE LEGEND
REGULATION 2003.
                                                                                                                                               m




                                                                                                                                                                                                                                                                                               - PEG
                                                                                                                                               4
                                                                                                                                            .83




SEWERAGE                                                                                                                                                                                                                                                                                  ST   - SEPTIC TANK
                                                                                                                                          211




SEWERAGE TO DISCHARGE TO SEWER MAIN                                                                                                                                                                                                                                                       WT   - WATER TANKS
OR ON SITE TREATMENT (TO ENGINEERS DESIGN)                                                                                                                                                                                                                                                PP   - POWER POLE
AND TO COUNCIL REQUIREMENTS.                                                                 38.6                                                                                                                                                                                         HW   - HOT WATER
                                                                                                    52m
                                                                                                            203                                                                                                                                                                           MB   - METER BOX
                                                                                                               °   03' 0
FOR CONSTRUCTION                                                                                                        0   "

                                                                   Rev No.                          Description                                         Date
                                                                     1       Concept Floor Plan                                                    12/08/2024                     Client:                      Sophie McLaren
                                                                                                                                                                                                                                                      SITE PLAN




                                                                                                                                                                                                                                                                                                                         22/11/2024 12:13:15 PM
                                                                     2       Concept Plans Selections                                              23/08/2024                     Description:                 New Dwelling
                                                                     3       Preliminary Working Drawings                                          28/08/2024                                                                                         Project number          6335
                                                                     4       For Construction                                                       3/10/2024
                                                                     5       For Construction - Lodgement                                          15/10/2024                     Site Address: 9 Rules Rd Pomona Qld                                 Date               12/08/2024            A102.01
                                                                     6       For Construction - Contract                                           18/11/2024                                                                                         Drawn by
    ©                                      QBCC Lic no. 15187645                                                                                                                                                                                      Checked by               T.D    Scale               As indicated
Log in to download the original file

BA250052 Architectural.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.