Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06

of 161

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

        The traffic generation calculation is summarised in Table 4.2.

        Table 4.2:            TRAFFIC GENERATION (MONTH)
                                    QUANTITY (TONNE /                       TRIP RATE                     VEHICLES
                                        MONTH)                           (VEH / TONNE)                 (VEH / MONTH)
          Pre-Development

          Green Waste                          2,960                            1.47                       4,356

          Mulch                                2,347                            0.21                        492

          Post-Development

          Green Waste                          5,223                            1.47                       7,687

          Compost                              3,143                            0.21                        657

          Increase

          Green Waste                          2,263                               -                       3,331

          Compost                               787                                -                        165

          Total Vehicles                                                                                   3,496

          Total Trips                                                                                      6,992


        The increase in trips was converted from a monthly value to Tuesday and Sunday peak hour
        values based on the tube count data. As shown in Table 4.3, traffic is expected to increase by
        30vph and 28vph in the Tuesday and Sunday peak hours, respectively.

        Table 4.3:            INCREASE IN TRAFFIC GENERATION (PEAK HOUR)
                                                        IN                             OUT                 TOTAL
          Tuesday

          % of Trips in Peak Hour                     0.48%                            0.49%                0.48%

          Traffic Generation (vph)                      17                              17                   34

          Sunday

          % of Trips in Peak Hour                     0.44%                            0.48%                0.46%

          Traffic Generation (vph)                      16                              17                   32


        It is anticipated that the amount of waste brought to site and processed would increase over time.
        To quantify the increase, a growth rate factor based on population growth has been applied to
        the development generated traffic. The forecast population data for Noosa Statistical Area 3, as
        published by the Queensland Government Statisticians Office, indicates a population growth rate
        of 0.5% per annum.

        Accordingly, a background growth rate of 0.5% per annum has been adopted. The application
        of this rate equates to a 6.4% increase in development generated traffic over a 12 year period
        (ie 2026-2038).




P:\2025-26\26-369 NOOSA RESOURCE RECOVERY CENTRE\OUTPUTS\26-369 TRAFFIC IMPACT ASSESSMENT FINAL.DOCX                   15

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Traffic Impact Assessment Final PTT.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.