Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
Table 4.4: EUMUNDI NOOSA ROAD / SITE ACCESS
ATTRIBUTE DOS AVG DELAY 95% QUEUE CRITICAL APPROACH
Tuesday Peak Hour
2028 Pre-Development 27% 1.4S 0.5 veh North – Through
2028 Post-Development 27% 1.6s 0.6 veh North – Through
2038 Pre-Development 32% 1.4s 0.7 veh East – Right Turn
2038 Post-Development 32% 1.6s 0.8 veh East – Right Turn
Sunday Peak Hour
2028 Pre-Development 30% 1.2s 0.5 veh North – Through
2028 Post-Development 30% 1.3s 0.6 veh North – Through
2038 Pre-Development 36% 1.2s 0.6 veh East – Right Turn
2038 Post-Development 36% 1.3s 0.7 veh East – Right Turn
4.4.2 Turn Warrant Assessment
An assessment of suitable turn treatments at the site access has been undertaken in accordance
with Figure 4A-1 of TMR’s Road Planning and Design Manual (RPDM) Volume 3: Supplement to
Austroads’ Guide to Road Design Part 4A. The assessment was undertaken using the forecast
2028 background traffic volumes (under the post-development scenario) presented in Appendix
F and the development generated traffic volumes shown in Table 4.5. The adopted parameters
are as follows, with results shown in Figure 4.3 and Appendix G.
Table 4.5: TURN WARRANT ASSESSMENT RESULTS
Design Vols Left Turn Right Turn
(vph): QM QL QM QR
AM: 477 68 1011 41
PM: 553 65 1169 37
Treatment AUL CHR
P:\2025-26\26-369 NOOSA RESOURCE RECOVERY CENTRE\OUTPUTS\26-369 TRAFFIC IMPACT ASSESSMENT FINAL.DOCX 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.