Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
Figure 4.3: TURN WARRANT ASSESSMENT RESULTS
As shown in Figure 4.3, the provision of an AUL and a CHR would be required at the site access.
As discussed in Section 2.2, the site access is currently supported by an AUL and a CHR(s).
Therefore, it is recommended that consideration be given to upgrading the existing CHR(s) on
Eumundi Noosa Road to a CHR in accordance with the requirements of Section 5.2 of Austroads
Guide to Road Design Part 4A: Signalised and Unsignalised Intersections.
The minimum requirements for a CHR have been determined based on a design speed of 90
km/h on Eumundi Noosa Road (ie 80km/h speed limit plus 10km/h) and consist of the following:
— a 75.0m diverge length, including a 25m long taper
— a 19.0m storage length to cater for one design turning vehicle (ie AV)
4.4.3 Intersection Delay
TMR’s GTIA defines the impact assessment area for intersection delay and road safety as all
intersections on the state-controlled road network where development traffic exceeds more than
5% of the base traffic for any movement in the year of opening (ie 2028).
The methodology for calculating the impact of a development in terms of intersection delay is
discussed in Section 11.2 of TMR’s GTIA. Consistent with the GTIA, net-change in delay is
calculated across the impact assessment area for the opening year (2028).
TMR’s GTIA outlines the following desired outcome with respect to intersection delay:
“The desired outcome is to ensure that the sum of intersection delays on base traffic in the
impact assessment area does not significantly worsen (ie does not increase average delay
be more than 5% in aggregate). In other words, the additional delays created by traffic
generated by the development need to be mitigated by upgrades to intersection in the impact
assessment area which reduce delays (in aggregate) to at least pre-development levels.”
Net-change in delay is calculated by summing the total vehicle minutes at the intersection for all
design peak periods assessed for the pre-development scenario (ie Tuesday and Sunday peak
hours). The post-development delay is calculated by multiplying the post-development average
delay per movement by the pre-development volume on each movement.
P:\2025-26\26-369 NOOSA RESOURCE RECOVERY CENTRE\OUTPUTS\26-369 TRAFFIC IMPACT ASSESSMENT FINAL.DOCX 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.