Council archive · source document
Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
The expected net change in delay has been calculated for the Eumundi Noosa Road / Site Access
priority-controlled intersection, as indicated in Table 4.6 and Appendix H.
Table 4.6: NET CHANGE IN DELAY
PRE-DEV DELAY (VEH-MIN) INCREASE IN
PEAK HOUR
VOLUME PRE-DEV POST-DEV DELAY
Tuesday 1,180 1,715 1,729 +0.8%
Sunday 1,340 1,624 1,637 +0.8%
Total 2,520 vph 3,339 3,366 +0.8%
Table 4.6 indicates that the additional development generated traffic would result in a 0.8%
increase in average delay for pre-development traffic at the Eumundi Noosa Road / Site Access
priority-controlled intersection. Therefore, the addition of development generated traffic does not
warrant mitigation works to be undertaken on the state-controlled road network.
P:\2025-26\26-369 NOOSA RESOURCE RECOVERY CENTRE\OUTPUTS\26-369 TRAFFIC IMPACT ASSESSMENT FINAL.DOCX 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.