Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
EXECUTIVE SUMMARY
INTRODUCTION
In February 2026, PTT was commissioned by Noosa Shire Council (Council) to undertake a traffic impact
assessment for a proposed compost facility at the Noosa Resource Recovery Centre (NRRC). The subject
site is located at 561 Eumundi Noosa Road, Doonan. Eumundi Noosa Road is a state controlled road.
EXISTING CONDITIONS
The existing site layout is shown in Figure E.1.
Figure E.1: SUBJECT SITE
The main points to note are:
— approximately 92,600 tonnes of waste in total were received for the 2023 / 2024 financial year
— approximately 17,000 tonnes of green waste are received by the site annually
— green waste is currently converted to mulch, with an estimated yield of 80% by weight
— there is currently one weighbridge which weighs inbound, outbound and internal movements
— the weighbridge service time is about 20 to 30 seconds per vehicle
— if more than 100 vph arrive at the site, queues would extend back onto Eumundi Noosa Road
— the site is accessed via a priority-controlled intersection with Eumundi Noosa Road
— the peak operating hours of the NRRC are Tuesdays (11:00am to 12:00pm) and Sundays
(11:15am to 12:15pm)
— intersection analyses indicate that the intersection currently experiences LOS A operations under
existing Tuesday and Sunday peak hour conditions
— right turns at the site exit have been banned in response to recent crashes
P:\2025-26\26-369 NOOSA RESOURCE RECOVERY CENTRE\OUTPUTS\26-369 TRAFFIC IMPACT ASSESSMENT FINAL.DOCX ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.