Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06

of 161

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

PROPOSED DEVELOPMENT
The proposal comprises a new compost facility and the layout is shown in Figure E.2.

Figure 3.1:         PROPOSED SITE LAYOUT




The main points to note are:

—      the proposed composting facility has been designed with a capacity of 25,000 tonnes per annum,
       with the flexibility to increase to 30,000 tonnes per annum within the existing infrastructure (ie a
       total increase of 13,000 tonnes per annum)
—      all green waste would be processed into compost with an estimated yield of 60% by weight
—      in addition, the proposal includes two new weighbridges (one inbound and one outbound
       weighbridge)
—      the existing weighbridge would be retained, accommodating inbound traffic only
—      the following modifications to the internal intersection are recommended to prioritise inbound
       traffic travelling to either the existing or proposed weighbridges:

       —       aligning the eastern leg with the western leg
       —       the addition of give-way line marking on the northern and eastern approaches
       —       the addition of white edge line marking to more clearly define the intersection area and
               access to the waste contractor parking
       —       wayfinding signage directing traffic to the on-site facilities

—      with two inbound weighbridges, if more than 170 vph arrive at the site, queues would extend back
       onto Eumundi Noosa Road
—      five additional parking spaces are required to accommodate the five additional staff associated
       with proposed expansion




 P:\2025-26\26-369 NOOSA RESOURCE RECOVERY CENTRE\OUTPUTS\26-369 TRAFFIC IMPACT ASSESSMENT FINAL.DOCX   iii

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Traffic Impact Assessment Final PTT.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.