Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
2.3.2 Area specific requirements
Table 8 Issues and current deficiencies identified in Area Specific Requirements, RRA1
Area Issue or consideration Mitigation through layout Mitigation through management
Concrete ◼ Long access route via weighbridge, there is a significant ◼ Locate concrete crushing close to entry point or ◼ Include the liquid waste and slurry into
Crushing number of concrete vehicles accessing this area (888 from with improved access, there is a significant water quality considerations and scope
offsite, 193 sales) portion of sales, 2-way required ◼ From received concrete quantities,
◼ Insufficient space impacting operations, a large portion of this is ◼ Separation of public and operational areas determine optimised stockpile size
taken up by stockpiled uncrushed concrete considering contractor crushing operations
◼ Concrete slurry and liquid waste received
Green ◼ Green Waste Area to be converted to composting area. ◼ Refer to concept design for layout ◼ Consider additional weighbridge for waste
Waste Area ◼ High number of vehicle movements (4356 from offsite, 492 considerations to Green Waste Area
sales) this is anticipated to increase significantly once ◼ Locate green waste area close to main entry and ◼ Separation of public and operational
composting begins consider sole access, 2-way access
Bulk ◼ C&I waste in light vehicles with a large proportion of mixed ◼ Increase the size and capacity of the Bulk ◼ Consider additional weighbridge for waste
Transfer trade and building waste, difficult and/or time consuming to Transfer Area to Bulk Transfer Station
Area sort. Congestion experienced in the transfer area from sorting. ◼ Locate the Bulk Transfer Area close to the entry ◼ Implement Public/ Operator side operations
◼ Long access route for vehicles utilising various recovery areas and provide access to the landfill (operations) to minimise interactions
that are required to use the weighbridge ◼ Consider turning movements for vehicle and ◼ Increased guidance for patrons and review
◼ Largest number of vehicles over the weighbridge (4845) trailer, queuing length within Bulk Transfer Area of fees and charges for unsorted waste.
Steel ◼ Long access route via weighbridge ◼ Prioritise access from offsite, with consideration ◼ Implement public and operational access,
Stockpile ◼ Simultaneous operations with the concrete drop off and less trips internally between Bulk Transfer Area, excavator sorting of steel stockpile, public
operation Public Transfer Area, and the steel stockpile drop off of steel materials, internal transfers
◼ Internal movements (75) to transport steel from public and bulk ◼ Locate close to bulk transfer area ◼ Co-locate white goods area for de-gassing
transfer areas to steek stockpile, high vehicles incoming (2320)
Asphalt ◼ Unclear the processing or disposal of asphalt, if this is inert ◼ Determine placement based on source, likely ◼ Understand process for asphalt – if
Stockpile inclusion to landfill, or recycled offsite? TBC council or DTMR projects not public, locate in crushed and combined with concrete, co-
◼ Vehicles to travel through the concrete drop-off and crushing operational access area not close to entry locate with concrete stockpile
area ◼ Locate with treated timber, no fixed plant. ◼ Investigate local asphalt recycling options
Treated ◼ No issues with the current operation or location ◼ Maintain current location separate from public ◼ From received treated timber quantities,
Timber ◼ Vehicles from RRA1 to landfill (91) and from offsite to landfill (5) access, internal transfers only from the public determine optimised shredding frequency.
Area and bulk transfer stations ◼ Establish a visual inspection area and
stockpile for removal of non-treated timber
Biochar ◼ Area and technology not yet known, space allowance only ◼ Potential for location near treated timber area – ◼ Operational access only – locate away
Area non-fixed plant, and close to source from public areas, and back of site.
Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.