Table 9       Issues and current deficiencies identified in Area Specific Requirements, Transfer Station Area

 Area          Issue or consideration                                               Mitigation through layout                                    Mitigation through management
 WMC area      ◼   NSC are looking to move WMC truck maintenance offsite,           ◼   Removal of WMC from one of the concepts for              ◼    Movement of bin and skip storage location
                   unclear whether this is confirmed.                                   optionality                                                   to RRA2 or other area of the NRRF
                                                                                    ◼   Reinstatement of WMC based on advice from                ◼    Review the number of waste vehicle
                                                                                        NSC, retain location in northern section                      spaces required
                                                                                                                                                 ◼    Implement in-truck scales to reduce
                                                                                                                                                      weighbridge passes
 NSC Office    ◼   Access through Reviva is required for the Ed Shed, reduced       ◼   Ed Shed to be moved to a location out of Reviva          ◼    Traffic management plan and designated
 and Ed            efficiency and disruption to Reviva operation.                       area, with direct access to carpark                           pedestrian pathways included to design
 Shed          ◼   NSC office is a demountable building, can be moved               ◼   Where possible, Ed Shed to be co-located with            ◼    Separated access from other waste vehicle
               ◼   NSC access of Ed Shed requires driving to public carpark or          NSC office                                                    streams and WMC operational vehicles
                   walking across roadway with no crossing facilities               ◼   Include carparking layout, access and line                    through barrier walls
               ◼   Carpark is not line marked, reduced capacity                         marking in layout to optimise spaces
                                                                                    ◼   Inclusion of bus parking for Ed-Shed
 Reviva        ◼   Not enough people are pulling into the drop off at Reviva at     ◼   Incorporate recoverables drop-off into small free        ◼    Provide incentives to increasing recovery,
 Complex           entry, recoverables are noted in transfer area                       of charge items aisles, and also provide skips for            including to small items, free of charge
               ◼   Reviva facility would benefit from additional space                  recoverables at bulk transfer bays
               ◼   Weighbridge queuing delays entry to Reviva carpark               ◼   Increase the size of the Reviva Facility
                                                                                    ◼   Reduce delays to public carpark by moving
                                                                                        weighbridges or provision of bypass
 Cardboard     ◼   Cardboard skips block access to operator side (collection) at    ◼   Cardboard collection moved to free of charge             ◼    Management of cardboard skips by forklift
 and RVM           RVM for bottles and cans                                             small items recovery area, in aisle.                          in non-public accessible area
               ◼   Cardboard passes over weighbridge are excessive considering      ◼   Cardboard access not through weighbridge                 ◼    Remove cardboard skip collections from
                   cardboard is deposited free of charge.                           ◼   Move RVM into aisle for small recyclable items                transfer area through provision go
               ◼   RVM access is from a separated carpark, requires parking at          and not separated                                             separated collection and traffic
                   RVM then secondary movement of vehicle to transfer bays,                                                                           management plan
                                                                                    ◼   Entry to small waste items prior to weighbridge
                   reduced likelihood of use due to inefficiency.
               ◼   RVM access is blocked/ delayed due to queuing from
                   weighbridge
 Oil and       ◼   Engine oil collection system is aged, reduced integrity. On      ◼   Separate the collection of oil, paints and other         ◼    Remove collections from transfer area
 Chemicals         recent site visit blocked                                            regulated waste and public use of transfer                    through provision go separated collection
               ◼   Chemicals not sorted, potentially an issue with segregation of       station bays                                                  and traffic management plan
                   chemical co-storage.
               ◼   Interaction between operational vehicles collecting paints and
                   oil and public users of transfer station bays



                                                                                                                              Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0   10

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Traffic Impact Assessment Final PTT.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.