Council archive · source document
Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
Table 16 Sensitivity on vehicle hours November 2023 Case 2 bay numbers
Check type Bay category Sensitivity of maximum vehicles in the hour
80% 85% 90% 95% 105% 110% 115% 120%
Number of Small vehicles 17.6 18.7 19.8 20.9 23.1 24.2 25.3 26.4
vehicles
Vehicles towing trailers 9.6 10.2 10.8 11.4 12.6 13.2 13.8 14.4
Large vehicles 2.4 2.55 2.7 2.85 3.15 3.3 3.45 3.6
Number of Small vehicles 4 4 4 4 4 4 4 4
bays
provided Vehicles towing trailers 4 4 4 4 4 4 4 4
Large vehicles BTF BTF BTF BTF BTF BTF BTF BTF
Cumulative Small and trailer bays 0.00 2.49 6.48 10.47 22.42 26.41 30.39 39.00
queuing in combined queue length,
coinciding maximum is 40m
peak hours
3.1.4 Transfer station sorting
To facilitate separation by the public, supported by NSC operators, in addition to operator sorting of waste
destined for landfill, aisles for shared skips are included in the transfer station layout. This alleviates operator
sorting effort after the walking floor. Sorting after the walking floor provides an opportunity for diversion of
recyclables and other streams for landfill that are not sorted or incorrectly identified for landfill by public. In
peak periods waste can be staged for delayed sorting. A walking floor has been included to the transfer
station design to convey waste from the transfer bay disposal points to an area for accumulation and
movement to sorting south of the transfer bays. An example of this used in similar waste application is
provided in Figure 7. The walking floor is controlled by an on/off mechanism enabling pause to accumulation
to provide a window for loader to clear the stockpile area. Safety concern raised by NSC regarding
inappropriate use of the walking floor and entering the walking floor is managed through full time operators
and the implementation of the on/off mechanism. This design element was selected as an opportunity for:
◼ Optimising use of available space and ease of customer use
− Providing adequate manoeuvring room for vehicles accessing transfer bays
− Retained drainage and water storage east of the transfer bays
◼ Reducing cost associated with a full length and width loader surge pit to southern accumulation
− Turnaround manoeuvring required
◼ Mitigation of interaction risk of customers with loader through separation of loader movements
◼ Pause to loading to mitigate the risk of concurrent waste disposal and clearing
Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.