Council archive · source document
Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
Table 13 Sensitivity on vehicle hours November 2023 design bay numbers
Check type Bay category Sensitivity of maximum vehicles in the hour
80% 85% 90% 95% 105% 110% 115% 120%
Number of Small vehicles 17.6 18.7 19.8 20.9 23.1 24.2 25.3 26.4
vehicles
Vehicles towing trailers 9.6 10.2 10.8 11.4 12.6 13.2 13.8 14.4
Large vehicles 2.4 2.55 2.7 2.85 3.15 3.3 3.45 3.6
Number of Small vehicles 5 5 5 5 5 5 5 5
bays
provided Vehicles towing trailers 4 4 4 4 4 4 4 4
Large vehicles BTF BTF BTF BTF BTF BTF BTF BTF
Cumulative Small and trailer bays 0 0 0 0 3.29 6.48 9.67 17.48
queuing in combined queue length,
coinciding maximum is 40m
peak hours
Table 14 Sensitivity on vehicle hours November 2023 minimum bay numbers
Check type Bay category Sensitivity of maximum vehicles in the hour
80% 85% 90% 95% 105% 110% 115% 120%
Number of Small vehicles 17.6 18.7 19.8 20.9 23.1 24.2 25.3 26.4
vehicles
Vehicles towing trailers 9.6 10.2 10.8 11.4 12.6 13.2 13.8 14.4
Large vehicles 2.4 2.55 2.7 2.85 3.15 3.3 3.45 3.6
Number of Small vehicles 4 4 4 4 4 4 4 4
bays
provided Vehicles towing trailers 3 3 3 3 3 3 3 3
Large vehicles BTF BTF BTF BTF BTF BTF BTF BTF
Cumulative Small and trailer bays 0.00 4.93 8.91 21.65 42.36 55.09 59.08 71.82
queuing in combined queue length,
coinciding maximum is 40m
peak hours
Table 15 Sensitivity on vehicle hours November 2023 Case 1 bay numbers
Check type Bay category Sensitivity of maximum vehicles in the hour
80% 85% 90% 95% 105% 110% 115% 120%
Number of Small vehicles 17.6 18.7 19.8 20.9 23.1 24.2 25.3 26.4
vehicles
Vehicles towing trailers 9.6 10.2 10.8 11.4 12.6 13.2 13.8 14.4
Large vehicles 2.4 2.55 2.7 2.85 3.15 3.3 3.45 3.6
Number of Small vehicles 5 5 5 5 5 5 5 5
bays
provided Vehicles towing trailers 3 3 3 3 3 3 3 3
Large vehicles BTF BTF BTF BTF BTF BTF BTF BTF
Cumulative Small and trailer bays 0.00 2.43 2.43 11.18 23.23 35.17 38.36 50.30
queuing in combined queue length,
coinciding maximum is 40m
peak hours
Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.