Appendix B - Amended Biome Consulting Response
Attached to the e-mail Amended Biome Report - stormwater in addition to Information Response - MCU170551 - 20 Trading Post Road Cooroy.msg.
The original of this document is very large (16.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Since the Issue A report results have been updated to incorporate slight modification to the Central Pond.
Updated results in Table 3-9 indicate that developed peak flows have been reduced below existing levels, which
demonstrates no adverse impact.
As indicated in the results, peak flows have been reduced below existing levels at both discharge locations. Therefore,
the results demonstrate that the proposed detention basins are adequate to reduce peak flows to ensure no adverse
impact due to the development.
The Water Surface Levels (WSL’s) determined in each basin have been indicated in Table 3-10 below.
Table 3-10: Developed Mitigated Scenario Basin Water Surface Levels
Northern Basin Central Basin
AEP
WSL (m AHD) Depth (m)1 WSL (m AHD) Depth (m)1
63% 99.92 0.52 100.28 0.68
39% 100.06 0.66 100.50 0.90
18% 100.19 0.78 100.64 1.04
10% 100.26 0.86 100.75 1.15
5% 100.37 0.97 100.96 1.36
2% 100.45 1.05 101.00 1.40
1% 100.51 1.11 101.03 1.43
Depth noted is the height above the stormwater quality temporary ponding level, which is 99.4m AHD and 99.2m AHD for the
Northern and Central Basin respectively.
The results above indicate that 300mm freeboard has been achieved to the top of each basin’s minimum embankment
level. Results also indicate that the major overflow weirs are only overtopped during the major storm events (i.e. during
the 2% and 1% AEP storms). During the 1% AEP storm, discharge across the major overflow weir is limited to a depth of
200mm. The depth velocity (dV) products reaches a maximum of 0.15m2/s for the major overflow weirs, which is lower
than the QUDM requirements.
Since the Issue A report results have been updated to incorporate slight modification to the Central Pond.
Updated results in Table 3-10 demonstrate that the same outcomes have been achieved as discussed above.
3.2.7 EXTREME EVENT SENSITIVITY CHECK
The major overflow/emergency weir for each detention basin has been designed to cater for extreme events, i.e. extreme
storms (i.e. 0.2% AEP storm event) and extreme blockage (100% blockage of basin pits/outlet pipes). To be conservative
the extreme 0.2% AEP storm event has been modelled with 100% blockage of the pits (considering weir flow only). The
0.2% AEP storm for 15 to 4320 minute durations has been modelled in XP-RAFTS with rainfall hyetographs generated
using the IFD parameters for Cooroy specified in Section 3.1.4. Results have been cross-checked with the 0.2% AEP
regional rainfall hyetograph for the 1440 minute storm duration adopted in Water Technology’s Cooroy Flood Study
(2013) model. The highest basin WSL was adopted from all these scenarios. Other than the rainfall parameters and basin
discharge values, all other modelling parameters remain the same as per the Developed Mitigated Scenario.
Table 3-11 below indicates 0.2% AEP basin WSL’s determined in XP-RAFTS.
Table 3-11: Extreme Storm Event Weir Assessment
Parameter Northern Basin Central Basin
Minimum Top of Embankment Level (m AHD) 100.8 101.30
Critical 0.2% AEP Storm Duration (minute) 45 minute 120 minute
0.2% AEP Basin WSL (m AHD) 100.72 101.26
16-001014-01B | STORMWATER MANAGEMENT PLAN COOROY RETIREMENT COMMUNITY, TRADING POST
(SWMP) | PALM LAKE RESORTS ROAD, COOROY | 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.