Skip to the record
Accept no imitations.

Original source · versioned page text

Appendix B - Amended Biome Consulting Response

Attached to the e-mail Amended Biome Report - stormwater in addition to Information Response - MCU170551 - 20 Trading Post Road Cooroy.msg.

of 100

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

The pollutant export and runoff parameters adopted for each sub catchment were as prescribed
within Table 3.8 and Table 3.7 of the Water by Design MUSIC v6 Modelling Guidelines (2010) for an
urban residential catchment. Table 3 summarises the bioretention node parameters.

                                              Table 3 Bioretention Parameters
                                   Parameter                                                           Bioretention D3
                                                   2
                               Surface area (m )                                                              75
                         Extended detention depth (m)                                                         0.2
                                               2
                                Filter area (m )                                                              75
                       Unlined filter media perimeter (m)                                                     0.01
                    Saturated hydraulic conductivity (mm/hr)                                                  200
                                Filter depth (m)                                                              0.4
                       TN content of filter media (mg/kg)                                                     400*
                   Proportion of organic material in filter (%)                                               <5
                Orthophosphate content of filter media (mg/kg)                                                30*
                               Is the base lined?                                                             Yes
                       Effectiveness of plant TN removal                                                  Effective
                            Overflow weir width (m)                                                    Surface Area/10
                            Exfiltration rate (mm/hr)                                                         0.00
                              Underdrain present?                                                             Yes
                    Submerged zone with carbon present?                                                       No
                  Confirmation that K and C* remain default?                                                  Yes

         Sediment Forebay Required (>2.5 ha contributing catchment)                                           Yes
*As per Healthy Land and Water Recommendations for MUSICv6 modelling

Modelling Results
Results of the MUSIC v6 modelling for the treatment train effectiveness are summarised in Table 4,
and show that the 80%, 60%, 45% and 90% reduction targets for TSS, TP, TN and gross pollutants
respectively were achieved for the rainfall data set simulated. A screen capture of the modelling
results is included as Figure 2.

                                          Table 4 Treatment Train Effectiveness

                              Inflows                   Outflows           Reduction               Reduction             Water Quality
    Pollutant
                               (kg/yr)                   (kg/yr)            (kg/yr)               Achieved (%)           Objective (%)

        TSS                    1,110                      166                   944                    85.1                  80.0
        TP                      2.29                      0.52                  1.77                   77.3                  60.0
        TN                      13.9                      6.33                  7.57                   54.5                  45.0
        GP                      157                         0                   157                    100                   90.0
NOTE: All simulations have been run with pollutant export estimation set to “stochastic generation”.




BIOME Consulting Pty Ltd
                                            M: 0415 935 222        E: [email protected]      ABN: 86 166 087 476          Page 3
PO Box 3469, Australia Fair
Southport QLD 4215
Log in to download the original file

Appendix B - Amended Biome Consulting Response.PDF · 16.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.