Appendix B - Amended Biome Consulting Response
Attached to the e-mail Amended Biome Report - stormwater in addition to Information Response - MCU170551 - 20 Trading Post Road Cooroy.msg.
The original of this document is very large (16.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Figure 2 Screen Capture of MUSIC Modelling Results
It is therefore expected that the bioretention filter area previously determined by Calibre Consulting
(75 m2) will be sufficient to meet the required pollutant removal targets in accordance with the State
Planning Policy for Healthy Waters and the Queensland Water Quality Guidelines (2009).
Request Item 5.
The provided stormwater management plan was provided for previous stages of the Palm Lakes
development and does not address design, construction or maintenance aspects of the current
proposed stage.
5 Provide an addendum or duplicate the Stormwater Management Plan to encompass the
design, construction and operation aspects of the area outlined within the Stormwater
Management Plan as D3 so that it can be appropriately referenced. The addendum/duplicate
must demonstrate how Specific Outcome O10 of the Water Sensitive Design Code of the
Noosa Plan is met.
BIOME Consulting Pty Ltd
M: 0415 935 222 E: [email protected] ABN: 86 166 087 476 Page 4
PO Box 3469, Australia Fair
Southport QLD 4215
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.