Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix B - Amended Biome Consulting Response

Attached to the e-mail Amended Biome Report - stormwater in addition to Information Response - MCU170551 - 20 Trading Post Road Cooroy.msg.

of 100

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Northern Basin: CONCEPT DETENTION BASIN DESIGN CALCULATIONS
File:      H:\B14\150-199\B14158.W\01 Final Layout Op Works\SW_Quantity\[B14158.W_Detention Basin Design (Master Layout).xls]WeirB
Date:      12/08/2015
User:      CM
Note:      Storage and outlet calcs for Detention Basin

STAGE - STORAGE RELATIONSHIP FOR WBNM
Stage areas taken from ACAD model
                                       Accumulated
   RL      Area. (m2)    Vol. (m3)       Vol. (m3)
   99.1                                      0
   99.2                                      0
   99.3                                      0
   99.4                                      0         Primary Front Orifice
   99.5                                     70
   99.6                                     144
   99.7                                     222
   99.8                                     306
   99.9                                     394
   100                                      487        Primary Outlet Pit
  100.1                                     585
  100.2                                     688
  100.3                                     796
  100.4                                     910
  100.5                                    1,030       Secondary Outlet Pit
  100.6                                    1,156
  100.7                                    1,287       Emergency Weir
  100.8                                    1,424

OUTLET CALCULATIONS
                             Bio
                                         Circular        Primary Front          Primary Outlet                             Secondary                          Major Overflow
                         Filtration                                                                  Balance Orifice                           Outlet Pipe
                                          Inlet 1           Orifice                  Pit                                   Outlet Pit                              Weir
Type                       Basin
Length                                                                                 0.9                                      0.9                 20
Width                                                                                  0.9                                      0.9
No.                                                             2                                           1                                       1
Dia (m)                                                        0.25                                        0.3                                    0.375
Height (m)
Area (m2)                   525                                                       0.81                                     0.81               0.110
Invert Level (R.L)          99.1                             99.4001                 100.0                  98              100.15001               98            100.4001
Inflow Level (R.L)          99.1                             99.4001                 100.0                 99.4             100.15001              99.4
D/S HGL (R.L)                                                                                                                                     0.000
f (Fig 1.6)                                                                                                                                       0.029
Pit Loss (K)                                                                                                                                         1
Hyd Cond. (k) (m/hr)        0.2
Depth Media d (m)           0.4
Perimeter (m)                                                                          2.7                                      3.6                                   4
% Opening Clear *                                                                     75%                                      75%

STAGE - DISCHARGE RELATIONSHIP FOR WBNM
            Accum.      Bio Filtration
   RL                                  Circular Inlet 1 Primary Front Orifice   Primary Outlet Pit    Balance Orifice   Secondary Outlet Pit    Outlet Pipe   Major Overflow Weir   Discharge (m3/s)
            Vol. (m3)      Basin

   99.4           0          0.051      0.00             0.00                  0.00             0.00                           0.00                0.00              0.00                0.00
   99.5           70          0.06      0.00             0.02                  0.00             0.23                           0.00                0.34              0.00                0.02
   99.6          144          0.07      0.00             0.06                  0.00             0.23                           0.00                0.36              0.00                0.06
   99.7          222          0.07      0.00             0.11                  0.00             0.24                           0.00                0.37              0.00                0.11
   99.8          306          0.08      0.00             0.14                  0.00             0.25                           0.00                0.38              0.00                0.14
   99.9          394          0.09      0.00             0.16                  0.00             0.26                           0.00                0.40              0.00                0.16
    100          487          0.09      0.00             0.18                  0.00             0.27                           0.00                0.41              0.00                0.18
  100.1          585          0.10      0.00             0.20                  0.14             0.28                           0.00                0.42              0.00                0.28
  100.2          688          0.11      0.00             0.22                  0.40             0.29                           0.07                0.44              0.00                0.35
  100.3          796          0.12      0.00             0.23                  0.74             0.30                           0.35                0.45              0.00                0.45
  100.4          910          0.12      0.00             0.25                  1.13             0.30                           0.75                0.46              0.00                0.46
  100.5         1030          0.13      0.00             0.26                  1.27             0.31                           1.07                0.47              0.23                0.70
  100.6         1156          0.14      0.00             0.28                  1.40             0.32                           1.21                0.48              0.72                1.20
  100.7         1287          0.15      0.00             0.29                  1.51             0.33                           1.34                0.50              1.45                1.95
  100.8         1424          0.15      0.00             0.31                  1.61             0.33                           1.45                0.51              2.41                2.92
Note:
The following equations have been used to calculate flow capcaties for the
outlet types for each stage:
Sand Filter Equation (NSW EPA 1997)               Q = A x k(h+d) / d
Pipe Flow (M.J.Boyd 1972)                         Q = 0.421 x g0.5 x Dia0.87 x HW 1.63 (where HW/Dia < 1.2)
                                                  Q = 0.53 x g0.5 x Dia1.87 x HW 0.63 (where HW/Dia > 1.2)
                                                  where g = 9.81m/s2
Weir Equation (AR&R Equ. 14.5)                    Qi = 1.66 x P x d1.5
Orifice Equation (AR&R Equ. 14.6)                 Qi = 0.67 x A x (2g x d)0.5
HGL Calculation (as per Section 5.21 QUDM)
Log in to download the original file

Appendix B - Amended Biome Consulting Response.PDF · 16.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.