Original source · versioned page text
Appendix C - Engineering Report
Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
5.0 EARTHWORKS The subject site currently supports development works with minimal earthworks required. Minor trimming, filling and excavation works for road construction, drainage, landscaping and sewer/water reticulation will be undertaken as part of proposed development works. Suitable building pads are readily achievable within the large building envelopes provided on each allotment. An existing dam located within existing Lot 3 on SP320405 and proposed Lot 4 is to be drained, desilted and filled as part of proposed development works. Consent to undertake these works has been provided by the adjacent property owner at 5 Triller Court (Lot 3 on SP320405). Refer to Appendix G for signed letter of consent. Details of proposed earthworks will be provided as part of future Operational Works applications. 6.0 STORMWATER MANAGEMENT 6.1 Legal Point of Discharge Engineering Drawing C6361/22/P05 attached as Appendix B indicates the Legal Point of Discharge (LPOD) and existing/proposed stormwater drainage infrastructure for the development site. The site is located on a minor ridge and slopes in a north-easterly and southerly direction at varying grades of 10-20%. Under existing conditions, stormwater runoff is conveyed towards the northern and southern boundaries as sheet and well-defined channel flow. 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.