Council archive · source document
OPW25/0012 - Fauna Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (18.3 MB): may take a few minutes to open.
Original PDF page 31, section 1. The text section number identifies this passage in the reader.
Fauna Management Plan 3-7 Serenity Close, Noosa Heads Most of the construction activities that can impact fauna are similar to the clearing activities mentioned in Section 4.2.1. Table 6 summarises the activities and management responses which need to be carried out during the construction phase of the development. TABLE 6: CONSTRUCTION ACTIVITIES. Action Task Responsibility Timing Restrict vehicle 1) No vehicle access to areas of vegetation yet Site Manager During access to be cleared. construction 2) Access is prohibited to vehicles outside of activities construction machinery. 3) Set lower vehicle speeds around the site so that motorists have a longer response time to avoid collision with potentially disoriented fauna. 4) Install signage depicting native wildlife in areas of vehicular traffic on site. Limit dust 1) Vehicles to drive slowly to keep dust clouds Site Manager During generation from forming. vegetation 2) Thoroughly clean machinery after use. clearing 3) Use barriers to control dust. Minimise 1) Trenches, pits and sediment ponds must be Fauna Spotter, During damage covered when not in use. Site Manager construction caused by 2) Unclimbable fences should be installed activities construction around any pits to prevent fauna from falling. material 3) Barbed wire, nets and other material that could entrap fauna should not be left unattended when not in use. 4) Electricity poles, towers and cranes must be wrapped to prevent fauna from climbing. 5) Suggested risk mitigation measures can be found in the Koala-Sensitive Design Guideline 2022 (Department of Environment and Science 2022). Restrict access 1) Any domestic pets brought onto site during Site Manager During to site by construction are to be prevented from construction domestic pets entering actual construction areas to avoid activities injury and/or predation of wildlife. 2) Guard dogs must be kept on a leash and under supervision at all times. All machinery 1) Visually check all the machinery for the Wildlife During is to be presence of wildlife before the start of Spotter/Catcher, construction checked for construction. Site Manager activities wildlife before 29 | 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW25/0012 - Fauna Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.