Fauna Management Plan 3-7 Serenity Close, Noosa Heads Action Task Responsibility Timing the beginning 2) Visually check all the routes for the presence of operations of wildlife before allowing construction to start. Salvage injured 1) If injured wildlife is detected during such Fauna Spotter, During wildlife activities, the Fauna Spotter must take Site Manager construction immediate action to notify the machinery activities operator to cease work, either verbally using two-way radio or by visual commands, until such time as the injured wildlife is captured or otherwise removed from danger. 2) All animals removed from the site must be captured, restrained and held in a manner that is unlikely to result in further injury, unacceptable distress or suffering. Animal welfare is the primary priority and responsibility of the Fauna Spotter. 3) All fauna injuries or deaths will be reported to the Fauna Spotter and/or Project / Site Manager. 4) Contact applicable agency / group listed in Table 3. Monitor 1) Artificial lighting on the subject site must be Fauna Spotter, During artificial operated to ensure it is directed away from Site Manager construction lighting the adjacent conservation areas and other activities fauna corridors to minimise impacts to koalas and other wildlife inhabiting or moving through the site. Adaptive 1) Project manager to conduct regular Site Manager During management, inspections to ensure compliance with construction monitoring and procedures outlined in this plan. activities compliance 2) Project manager to issue notice of compliance to contractor for non- conforming works and any remedial works to ensure compliance. 4.4 POST-CONSTRUCTION MANAGEMENT MEASURES After construction activities, there are several procedures and actions that must be followed to ensure the site presents no risk to fauna. Procedures and actions include removing all construction material that could potentially be harmful to koalas and monitoring the site for the presence of koalas at the end of construction activities. Table 7 summarises the activities and management responses that need to be carried out during the post-construction phase of the development. 30 | 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW25/0012 - Fauna Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.