Fauna Management Plan
3-7 Serenity Close, Noosa Heads




 Action            Task                                                   Responsibility   Timing
 the beginning     2) Visually check all the routes for the presence
 of operations        of wildlife before allowing construction to
                      start.
 Salvage injured   1)   If injured wildlife is detected during such       Fauna Spotter,   During
 wildlife               activities, the Fauna Spotter must take           Site Manager     construction
                        immediate action to notify the machinery                           activities
                        operator to cease work, either verbally using
                        two-way radio or by visual commands, until
                        such time as the injured wildlife is captured
                        or otherwise removed from danger.
                   2) All animals removed from the site must be
                      captured, restrained and held in a manner
                      that is unlikely to result in further injury,
                      unacceptable distress or suffering. Animal
                      welfare is the primary priority and
                      responsibility of the Fauna Spotter.
                   3) All fauna injuries or deaths will be reported
                      to the Fauna Spotter and/or Project / Site
                      Manager.
                   4) Contact applicable agency / group listed in
                      Table 3.
 Monitor           1)   Artificial lighting on the subject site must be   Fauna Spotter,   During
 artificial             operated to ensure it is directed away from       Site Manager     construction
 lighting               the adjacent conservation areas and other                          activities
                        fauna corridors to minimise impacts to
                        koalas and other wildlife inhabiting or
                        moving through the site.
 Adaptive          1)   Project manager to conduct regular                Site Manager     During
 management,            inspections to ensure compliance with                              construction
 monitoring and         procedures outlined in this plan.                                  activities
 compliance        2) Project manager to issue notice of
                      compliance to contractor for non-
                      conforming works and any remedial works
                      to ensure compliance.


4.4 POST-CONSTRUCTION MANAGEMENT MEASURES


After construction activities, there are several procedures and actions that must be
followed to ensure the site presents no risk to fauna. Procedures and actions include
removing all construction material that could potentially be harmful to koalas and
monitoring the site for the presence of koalas at the end of construction activities. Table 7
summarises the activities and management responses that need to be carried out during
the post-construction phase of the development.




                                                                                               30 | 35

Used in these records

About this file

File size
18.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW25_0012 - Fauna Management Plan.pdf · 18.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.