Fauna Management Plan 3-7 Serenity Close, Noosa Heads TABLE 7: POST-CONSTRUCTION ACTIVITIES. Action Task Responsibility Timing Remove 1) Temporary fauna exclusion fences should be Site Manager After temporary removed and appropriately disposed once construction fauna construction is complete. activities exclusion 2) Any excavation associated with temporary fences fauna exclusion should be backfilled to prevent ay fauna becoming trapped or injured. Remove 1) All construction signage is to be removed Site Manager After construction from the site at the end of construction construction signage activities. activities Ensure that no 1) All material susceptible to cause physical Site Manager After material that harm to wildlife must be removed construction could cause immediately after use. activities potential harm 2) No toxic waste is to be stored on site at the to wildlife has end of the construction period. been left on 3) All waste is to be managed responsibly and site sustainably to the maximum practicable extent throughout the construction period. 31 | 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW25/0012 - Fauna Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.