Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

CoverLetter_Stage2_LeveeBanks · OPW14/0369

Attached to the e-mail OPW14/0369 Operational Works Application Flood Mitigation - Stage 2 - Retaining Wall - Daintree.

of 2

Text shows just the words. Original shows the document exactly as it was published.

Callaghan & Toth Consulting Engineers Pty Ltd
ABN No. 45140292324
Callaghan & Toth Consulting Engineers Pty Ltd
ACN No. 140292324
8/41 Sunshine Beach Road Noosa Junction
P.O Sunshine
6/41 Box 2305Beach
              Noosa  Heads
                   Road     4567
                         Noosa
www.callaghanandtoth.com.au
P.O Box 2035 Noosa Heads 4567
                               Junction                                                                        Callaghan & Toth
www.callaghanandtoth.com.au
Ph: 07 5474 9081                                                                            Civil, Environmental & Hydraulic Engineers
Ph: 07 54749081 Fax 07 54749041




           24th November 2014                                                                                               Our Ref: 1415


           Mark Lewis
           Senior Engineering Officer
           Noosa Council
           Via Email: [email protected]}



           RE:    Operational Works application – Category 2 Levee Banks for Flood Mitigation at Daintree Estate,
           Tewantin; STAGE 2 Works (Retaining Wall)

           Please see attached an Operational Works application for works associated with flood mitigation at Daintree
           Estate, Tewantin, as follows:

                      Stage 2 works for Category 2 levee bank (CH0 to CH485, CH600-753) with works occurring in Lot 959
                       NPW1140, Lot 959 NPW1141, and Leafhaven Drive road reserve. Stage 2 works will occur on the
                       southern and western boundaries of the estate and involve diversion levee walls (besser block) to divert
                       flows around the estate and into the tributary of Wooroi Creek. Some works encroach into the adjacent
                       Tewantin National Park.

           These Stage 2 measures are part of the floodplain management measures to protect properties within the
           Daintree Estate from flood events. Other measures proposed to protect these properties include:
                Closing off some existing culverts to divert flows around the estate. These works are within Lot 993
                    SP110896 – drainage reserve within the estate.

           The flood mitigation works are currently being assessed by the Department of Environment and Heritage
           Protection - Queensland National Parks and Wildlife Service, under an Application for an interest in a protected
           area (Section 34 of the Nature Conservation Act 1992).

           For Stage 2 Operational Works – Category 2 levee banks, the following documents are attached:

                 1.    IDAS Form 1
                 2.    IDAS Form 20
                 3.    Engineering Plans 1415-01, to 40 inclusive.
                 4.    Flora and Fauna Assessment Report
                 5.    Environmental Management Plan

           This Stage 2 levee bank (constructing a retaining wall from CH0 to CH485, CH600-753) is determined to be
           Category 2 as there is zero population affected by the off-property impacts. There are no buildings subject to
           increased flood levels and/or velocities as a result of the proposed works.

           The Operational Works fee's has been calculated as follows:

                       Base Fee                                                      $ 834.00
                       Works relating to Category 2 levee banks                      $ 1,575.00
                       TOTAL                                                         $ 2,409.00

           If you require any further information please contact me on 5474 9081 or 0401 570 753, or Adam Britton,
           Council’s Project Manager for these works.

           X:\JOBS\CT Projects in progress\1415 NC flooding\Daintree detail plans Correspondence\OpWorks_LeveeBanks\Stage
           2_LeveeBanks\CoverLetter_Stage2_LeveeBanks.docx
Full text of the other 1 page

Page 2

Yours faithfully,
Callaghan & Toth




Jane Davissen BE Environmental
Senior Environmental Engineer
Please view www.callaghanandtoth.com.au for all information on our company profile and terms and conditions for services rendered




X:\JOBS\CT Projects in progress\1415 NC flooding\Daintree detail plans Correspondence\OpWorks_LeveeBanks\Stage
2_LeveeBanks\CoverLetter_Stage2_LeveeBanks.docx

Used in these records

About this file

File size
177 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

CoverLetter_Stage2_LeveeBanks.pdf · 177 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.