Attachment D - Planning Scheme Statement
Attachment C
Assessment Against the Planning Scheme – Driveways and Parking Code
Performance Outcomes Acceptable Outcomes Compliance
Driveways
PO1 AO1
Vehicular access does not O1.1 Can comply – proposal plans have been
adversely impact on safety, Vehicular access is located and designed in prepared by SCG Consulting Engineers
capacity and operations of the accordance with the current Australian to demonstrate the ability to comply to
existing or planned road network, Standards for Parking Facilities. PO1 and are included in Attachment B.
cycleways or pedestrian pathway
systems. AO1.2
Only one footpath crossing is provided.
Editor’s Note— Justification for additional
driveways may need to be supported by a
detailed Traffic Study.
AO1.3
Driveways, have a maximum grade in
accordance with Council’s standard
requirements.
PO2 AO2 Can comply – proposal plans have been
Driveways and crossovers Design and construction of driveways, prepared by SCG Consulting Engineers
(a) are suitable and safe for including across the footpath, is in to demonstrate the ability to comply to
their intended use; and accordance with Council Standard Drawings PO2 and are included in Attachment B.
(b) match Council infrastructure. as appropriate for the particular type of .
development as annotated on the drawings.
AO2.2
The change of grades in driveways and
ramps is in accordance with Council’s
Standard Drawings.
PO3 AO3.1
The number of driveways across Design of multi-tenanted developments Can comply – proposal plans have been
pedestrian footpaths is include shared driveways and prepared by SCG Consulting Engineers
minimised. parking areas. and demonstrate that the second
crossover is appropriate for the site in
AO3.2 accordance with PO3 as identified in
Driveways are located so they abut existing Attachment B.
driveways of adjoining development where
practicable and reciprocal easements are
created to reduce the sealed driveway width.
PO4 AO4.1
Vehicular access does not Footpath and kerb crossings are located Can comply – proposal plans have been
adversely impact on the capacity, clear of existing stormwater inlet structures, prepared by SCG Consulting Engineers
operations and maintenance of water and sewerage infrastructure fittings, to demonstrate the ability to comply to
the existing infrastructure. any other exiting utility infrastructure, PO4 and are included in Attachment B.
existing landscaping and vegetation.
PO5 AO5
Vehicular access does not Vehicular access avoids disturbance to the Can comply – proposal plans have been
adversely impact on the health tree protection zone of trees on public land. prepared by SCG Consulting Engineers
and integrity of existing to demonstrate the ability to comply to
landscaping or native vegetation, PO5 and are included in Attachment B.
where possible. .
Parking and manoeuvring Table 9.4.1.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Compliance
Parking and maneouvring
PO6 AO6.1
Sufficient parking The number of car parking spaces, motor Complies – the dwelling and shed
(a) is provided having regard to cycle spaces, bicycle spaces and loading provides in excess of 2 undercover
the specifics of the use bays is not less than the minimum number parking spaces as detailed on the
including- specified in Table engineering plans at Attachment B.
(i) the type and intensity of 9.4.1.4 Minimum parking requirements
land use; including end of trip facilities.
(ii) any existing parking
available on the site; Editor's note— with regard to the provision
(iii) hours of operation; of end of trip facilities, where there is a
(iv) likely numbers of conflict with the QDC MP 4.1 for major
users; developments the QDC applies. For all other
(v) accessibility to the site by development Table 9.4.1.4 applies.
means other than
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
Attachment C
Assessment Against the Planning Scheme – Driveways and Parking Code
private motor vehicle; AO6.2
(vi) the peak parking Where appropriate, motorcycle spaces can be
demand periods of provided on site in lieu of required car parking
uses on the site; and spaces, excluding industry activities, at the
(vii) the availability of following rates:
alternative car parking; a) 2 motorcycle spaces provided for 0.5 car
and parking space; or
(b) is provided to b) 4 motorcycles spaces provided per 1 car
accommodate the parking space; and
number and type of c) up to a maximum of 4 car parking spaces.
vehicles and
motorcycles likely to be AO6.3
generated by the Secure and convenient parking spaces for bicycles
development. are designed and provided on site in accordance
with—
a) AS2890.3 Bicycle Parking Facilities; and
b) Cycling aspects of Austroads Guides (AP-
G88-14).
AO6.4
Bicycle spaces and end of trip facilities need to be
accessible to all users.
PO7 AO7.1
The layout of the development Parking bays, manoeuvring areas, queuing areas, Complies – the proposal will provide
provides adequate, clearly loading, set down, pickup areas and driveways are parking and maneuvering area in
defined and easily accessible designed in accordance with the Australian compliance with the relevant Australian
(a) on-site vehicle parking Standards for Parking Facilities. Standards as detailed in the engineering
and manoeuvring areas; plans at Attachment B.
and AO7.2
(b) loading and Development includes purpose designed spaces
manoeuvring areas for for motorcycles and motor scooters, which are
delivery and service easily identified from the driveway of the property
vehicles. and located as close as practicable to the entrance
of the building on site.
PO8 AO8.1
Parking and manoeuvring Parking, service areas and manoeuvring areas are Complies – the proposal plans comply
areas are designed to setback a minimum of 2 metres from road with MCU23/0053 and incorporate
(a) not unduly conflict with frontages to allow for landscaping, with the appropriate landscape setbacks in the
pedestrians; and exception of Walter Hay Drive, Eenie Creek Road landscape plans at Attachment C.
(b) be sufficiently setback and Holts Road frontages, where no development
from road frontages to occurs within the landscaped frontage setbacks.
not dominate the
streetscape or AO8.2
surrounding areas; In Centre zones, parking, service and manoeuvring
(c) allow for landscaping to areas are either integrated within or under
reduce the visual impact buildings and sleeved by usable floor space, or
of the parking, servicing located to the rear of buildings.
and manoeuvring
areas; Editor's note— Refer to Figure AP3-11A and
(d) complement the future Figure AP3-11B for outcomes for car parking in
planned character of the centres.
area; and
(e) avoid development AO8.3
within the Walter Hay Where practicable vehicle access is from rear
Drive, Eenie Creek laneways.
Road and Holts Road
frontage setbacks.
PO9 AO9
On-site car parking spaces are Car parking spaces are provided for people with Not Applicable – the proposal involves a
identified and reserved for disabilities at the rate specified in the current residential shed.
people with disabilities. Australian Standards for Parking Facilities.
PO10 AO10 Complies – the proposal will provide
Access and egress points do Vehicle manoeuvring areas are provided in parking and maneuvering area in
not impact on the safety and accordance with the current Australian Standards compliance with the relevant Australian
operations of the road system. Australian Standards for Parking Facilities so Standards and ensure vehicles can leave
vehicles enter and leave the site in a forward gear, in a forward gear as detailed in the
engineering plans at Attachment B.
Page 3
Attachment C
Assessment Against the Planning Scheme – Driveways and Parking Code
excluding dual occupancy or detached dwellings
on local roads.
PO11 AO11 Complies – the crossover is located in
Parking areas are designed to At locations where pedestrian and vehicle conflicts safe position and ensures adequate sight
(a) provide a progressive are likely to occur: distances have been provided as detailed
reduction in speed a) sight distances of at least 2.5 seconds of travel in the engineering plans at Attachment B.
between the external time at the designated speed are provided;
road and internal b) splayed corners on structures are
parking spaces; incorporated;
(b) ensure lower speeds c) landscaping is designed to allow clear views;
near areas of high and
pedestrian activity d) sign placement ensures that sight distance
through the use of requirements are not impeded.
appropriate road
geometry or devices
designed to limit speed;
and
(c) maintain sight distances
which are appropriate
for the likely operating
speeds in all areas of
potential
pedestrian/vehicle and
vehicle/vehicle conflict.
PO12 AO12.1
A clearly defined pedestrian In large open carparks with greater than 200 car Not applicable
network is provided that – parking spaces, a pedestrian path between parking
(a) is located in areas spaces is provided on every second aisle.
where people will
choose to walk; AO12.2
(b) ensures that pedestrian For a minimum of 50% of car parking spaces, Not applicable
movement through car pedestrian access to buildings is not across or
parking areas or through driveways, carparks, setdown or
structures are along manoeuvring areas.
aisles rather than across
them.
PO13
Provision is made for No acceptable outcome provided Not applicable
pedestrian and vehicular
queues at conflict points.
PO14 AO14
Parking areas are lit to provide Lighting is provided in accordance with the Not applicable
security for night-time users. Australian Standard for Road Lighting - Vehicular
Traffic (Category V) Lighting - Performance
Installation and Design Requirements.
PO15 AO15
Site facilities encourage users End-of-trip facilities are maintained and accessible Not applicable
and employees to access the to all users of the premises as part of common
site by means of foot or property.
bicycle through provision of
appropriate end of-trip
facilities including bicycle
parking and shower/change
rooms.
PO16
Development with the No acceptable outcome provided Not applicable
potential to generate
significant traffic and parking
impacts gives appropriate
consideration to transport and
land use issues.
Editor’s Note—A detailed
Traffic Impact Assessment
Report may be required.
Page 4
Attachment C
Assessment Against the Planning Scheme – Driveways and Parking Code
PO17 AO17.1
Parking and manoeuvring Development providing less than five car parking Can comply – proposal plans have been prepared by
areas are designed to ensure spaces is designed so that the driveway, parking SCG Consulting Engineers and to demonstrate the
run-off is treated to remove and manoeuvring areas are formed to drain to building and driveway is appropriately drained as
pollutants prior to leaving the landscaped areas. detailed in Attachment B
premises.
AO17.2
Development providing five or more car parking
spaces is designed to incorporate stormwater
treatment methods to remove water contaminants
likely to runoff from the general operation of the of
the driveway, parking and manoeuvring areas.
Editor’s Note—Further details are provided in the
Water Quality and Drainage Code.
PO18
Parking areas are designed to No acceptable outcome provided Complies – The development does not require a
ensure drainage without the pump.
use of pumps or other
electrical apparatus
PO19 AO19
Site layout and building design Below ground components of buildings, including Can comply – The site is appropriately landscaped
provides for soft landscaping carparks, do not extend beyond the above ground as detailed in Attachment C.
to be established. footprint to allow for the provision of landscaping,
particularly within building setbacks.
Page 5
Page 6
Attachment C
Assessment Against the Planning Scheme – Earthworks Code
Performance Outcomes Acceptable Outcomes Compliance
Effects of works
Drainage AO1
PO1 Can comply – proposal plans have been
Finished surface levels ensure land Filled or excavated areas have a minimum gradient prepared by SCG Consulting Engineers to
is free draining. of 0.5% and drain to Council’s stormwater demonstrate the ability to comply to PO1 and
infrastructure where available, or where stormwater are included in Attachment B.
infrastructure is not available, toward the street.
Hydraulics No acceptable outcome provided Can comply – proposal plans have been
PO2 prepared by SCG Consulting Engineers to
Change to the levels on site do not demonstrate the ability to comply to PO2 and
have an adverse impact on the are included in Attachment B.
flooding and drainage .
characteristics off-site.
Geotechnical considerations AO3.1
PO3 Filling works are undertaken in accordance with Can comply – proposal plans have been
Earthworks do not result in Council’s Planning Scheme Policy PSP6 prepared by SCG Consulting Engineers to
geotechnical instability on-site or Engineering design standards - roads, drainage demonstrate the ability to comply to PO3 and
to nearby premises. and earthworks. are included in Attachment B.
AO3.2
Where the filling is for residential, commercial or
industrial purposes the works comply with
Australian Standard - Guidelines for earthworks on
commercial & residential development.
Local amenity AO4.1
PO4 The following control measures are implemented— Can comply – proposal plans have been
Undertaking earthworks does not prepared by SCG Consulting Engineers to
adversely impact on the amenity of a) regular water spraying of exposed areas to demonstrate the ability to comply to PO4 and
the local area by way of dust, noise or suppress dust; are included in Attachment B.
visual amenity. b) provision of dust stabilised or sealed internal
roads;
c) protective covering of exposed areas that are left
for more than 2 weeks; and
d) unless a development permit provides otherwise,
disturbed areas are revegetated using species
identified in Council's Planning Scheme
Policy PSP2 Landscaping.
AO4.2
Earthworks are undertaken only during the hours
of 7:00am to 6:00pm, Monday to Friday and
7:00am to 3:00pm on Saturday. No work is
undertaken on Sunday or public holidays.
Vegetative waste AO5.1
PO5 Cleared vegetation is transported off-site for Can comply – Any cleared vegetation will be
Vegetation cleared from a disposal in an approved green waste disposal disposed of appropriately.
development site is disposed of in facility.
an environmentally responsible
manner. AO5.2
Cleared vegetation is mulched on-site and reused
for landscaping of the finished development.
AO5.3
Cleared vegetation is disposed of for the purpose of
firewood.
AO5.4
Disposal of vegetative waste by burning off is
avoided.
Managing contamination risk AO6.1
PO6 Fill material is solid clean earth, free of putrescible Complies - Fill material will come from cutting
Materials used as fill are suitable or refuse material, vegetation, acid sulfate at the site.
for development and future use of soils, building or construction material or other
the land and filling or excavation material or contaminants.
works do not result in the
contamination of land. AO6.2
Page 7
Attachment C
Assessment Against the Planning Scheme – Earthworks Code
The site is not on the contaminated land register.
Haulage activity and amenity No acceptable outcome provided
PO7 Not Applicable
Haulage of material to and from
a site ensures—
a) minimal disturbance to
neighbouring properties and
properties along the haulage
route; and
b) Council’s road infrastructure
including pavements is not
adversely affected.
Extent of earthworks AO8
PO8 All earthworks, including cut and fill batters, Complies - All earthworks will be retained
The layout of the development retaining walls and the like are contained within the within the site as detailed on the engineering
provides adequate, clearly defined subject site. plans prepared by SCG Consulting Engineers
and easily accessible— at Attachment B.
a) on-site vehicle parking and
manoeuvring areas; and
b) loading and manoeuvring areas
for delivery and service vehicles.
Sloping Sites AO9
PO9 Cut or fill is less than 1.5 metres in depth relative to Complies - All earthworks will be as approved
On sloping sites development the natural ground level. by MCU23/0054 and appropriately follow the
follows the natural landform natural form as detailed on the engineering
wherever practical and excavation plans prepared by SCG Consulting Engineers
or filling is minimal. at Attachment B.
Infrastructure protection
PO10 No acceptable outcome provided Complies – The earthworks will not impact on
Earthworks and existing infrastructure.
vehicular access do not adversely
impact on the capacity, operations
and maintenance of existing
infrastructure.
Environmental protection No acceptable outcome provided
PO11 Complies – The earthworks will not impact on
Earthworks minimise any adverse existing infrastructure. groundwater,
impact upon groundwater, watercourses, drainage lines, wetlands, and
watercourses, drainage lines, native vegetation.
wetlands, and native vegetation.
Dams
PO12 AO12.1 Complies - All earthworks will be as approved
Dam location and construction Where the site is in the Rural zone— by MCU23/0054 and not impact on the
does not impact upon neighbouring adjoining properties as detailed on the
properties or road reserves, in a) the land has a slope of less than 25% (1:4); engineering plans prepared by SCG
terms of— b) the earthworks including cut and fill batters and Consulting Engineers at Attachment B.
a) hydrology; retaining walls are setback a minimum of 50
b) alteration of existing overland metres from the property boundary; and
flow paths and patterns; c) the size of the lot is greater than 5 hectares.
c) landslide or failure of dam wall;
and AO12.2
d) effluent disposal areas. Where the site is in the Rural residential zone or the
Rural zone and the lot is less than 5 hectares:
a) the land has a slope of less than 1:6;
b) the earthworks including cut and fill batters and
retaining walls are setback a minimum of 20
metres from the property boundary; and
c) the dam work involves less than 500m³ of
material.
AO12.3
For all other zones—
No acceptable outcome provided
Page 8
Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code
Stormwater Drainage 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Compliance
Stormwater drainage design
PO1 AO1
The development and its A stormwater management plan is prepared Complies – please refer to the stormwater
stormwater management system consistent with PSP6 Engineering Design management plan prepared by SCG Consulting
is planned and designed having Standards - Roads, drainage and earthworks. Engineers at Attachment B.
regard to:
(a) the natural features of
the site;
(b) the need to avoid impacts
and potential risks
to ecologically important
areas;
(c) the likely effectiveness of
erosion and sediment
control and stormwater
drainage measures during
rainfall events during and
post construction; and
(d) the need to protect
environmental values and
water quality of receiving
waters both during and post
construction.
PO2 AO2.1
Stormwater drainage Stormwater drainage planning, design and Complies – please refer to the stormwater
management plan prepared by SCG Consulting
Engineers at Attachment B.
infrastructure is planned, construction is in accordance with PSP6
designed and constructed to: Engineering Design Standards - Roads,
(a) incorporate allowance for drainage and earthworks and the latest version
increased flood risk and tidal of the Queensland Urban Drainage Design
inundation through pipework Manual.
as a result of climate change
and sea level rise; AO2.2
(b) ensure the development is The stormwater drainage system connects to a
adequately drained; and lawful point of discharge in accordance
(c) ensure stormwater is with PSP6 Engineering Design Standards -
managed and lawfully Roads, drainage and earthworks.
discharged without altering
stormwater drainage AO2.3
characteristics external to Stormwater flows discharging from the
the site. development are demonstrated to be consistent
with pre-development characteristics.
AO2.4
Development provides for the management of
stormwater to incorporate appropriate allowance
for climate change impacts (including rainfall
intensity and sea level rise), in accordance
with PSP6 Engineering Design Standards –
Roads, Drainage and Earthworks.
PO3 AO3.1 Complies – Please refer to the stormwater
Stormwater drainage Stormwater drainage infrastructure meets the management plan prepared by SCG Consulting
infrastructure conveys run-off in a desired standards of service for roads Engineers at Attachment B.
manner that allows roads to functionality set out in PSP6 Engineering Design
deliver desired standards of Standards - Roads, Drainage and Earthworks.
service appropriate to the local
conditions and local stormwater
drainage characteristics.
PO4 AO4.1 Complies – Please refer to the stormwater
Stormwater infrastructure is The location, design and construction of management plan prepared by SCG Consulting
compatible with existing stormwater drainage structures is in accordance Engineers at Attachment B.
infrastructure, allows for with PSP6 Engineering Design Standards -
easy access for the ongoing Roads, drainage and earthworks.
maintenance by Council, is cost
effective across its design life. AO4.2
Where infrastructure is located on private land
Page 9
Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code
an easement is dedicated over the infrastructure a
in accordance with PSP6 Engineering Design
Standards - Roads, drainage and earthworks.
AO4.3
Any alterations or repairs to infrastructure as a
result of the development are made at no cost to
Council.
AO4.4
Development avoids stormwater inflow and
infiltration to the sewer infrastructure network.
AO4.5
Stormwater infrastructure is designed to
minimise maintenance costs and the
requirement for specialized equipment for
maintenance techniques.
PO5 AO5.1 Complies – Please refer to the stormwater
management plan prepared by SCG Consulting
Engineers at Attachment B.
Stormwater drainage Stormwater drainage infrastructure avoids
infrastructure is aligned to avoid crossing waterways, wetlands drainage lines
crossing waterways, wetlands, and ecologically important areas or follows the
drainage lines and ecological edge of existing disturbed areas.
important areas, or where it is
demonstrated this is unavoidable, AO5.2
disturbed areas are reinstated and Stormwater drainage infrastructure is co-located
revegetated upon completion of with other infrastructure within a combined utility
works. corridor where appropriate.
AO5.3
Temporary vehicular crossings of waterways
must be designed and constructed to be
consistent with the current International Erosion
Control Association Best Practice Book Series.
Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Compliance
Stormwater quality and protection of receiving waters
PO6 AO6.1
Development is located, Stormwater runoff discharging into High Not Applicable
designed, constructed and Ecological Value waters as a result of
operated to protect and enhance development causes no increase in gross
environmental values and water pollutants, total suspended solids, total
quality of waterways, wetlands, phosphorous or total nitrogen compared to a
lakes, ground waters and pre-development scenario.
drainage systems.
AND
Editor’s note: Environmental AO6.2
values of waters and water quality All stormwater runoff is treated to achieve
objectives are prescribed in maximum removal of nutrients, gross pollutants
Schedule 1 of the Environmental and suspended solids as determined by cost to
Protection (Water) Policy 2009 efficiency ratios. (e.g. bioretention basins must
and are identified on the State be sized to achieve at least 80% reduction in
Planning Policy Interactive total suspended solids, 60% reduction in total
Mapping System. phosphorous, 45% reduction in total nitrogen
and 90% reduction in gross pollutants >5mm).
OR
AO6.3
Developments achieve a minimum 3 drop rating
consistent with the Water by Design Living
Waterways Scoring Guide (Healthy Land and
Water).
Page 10
Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code
Editor’s note— PSP6 Engineering Design
Standards - Roads, Drainage and
PO7 AO7.1
Water quality treatment systems Water quality treatment systems are designed to Not applicable
use natural processes and be integrated into the landscape consistent with
materials, whenever possible, and the technical design guideline published by
are integrated into development to Healthy Land and Water Water by Design for the
enhance biodiversity and feature. (eg. For Bioretention Basins:
landscape benefits. Bioretention Technical Design Guidelines
(October 2014) and for Wetland Systems
the Wetland Technical Design Guideline (May
2017).
PO8
Water quality treatment AO8.1 Not applicable
infrastructure to be dedicated as Detailed life cycle costing is provided for the
public assets are proven to be entire treatment train system including
suitable for its use and of a cost replacement costs of asset parts.
effective and efficient standard.
AO8.2
Treatment systems dedicated as public assets
are designed to minimise maintenance, renewal
and adaption costs and the requirement for
specialised equipment, material or maintenance
techniques.
AO8.3
Vegetated stormwater management systems to
be dedicated as public assets are established
and maintained during the maintenance period
to ensure optimal vegetated growth and that the
functional elements of the system achieve the
design function at the end of the maintenance
period.
PO9 AO9.1 Not applicable
Treatment systems are designed Free draining inlets and outlets are provided to
to eliminate or minimise health, ensure that waters do not pond for more than 24
safety and aesthetic hazards, hours.
including risks associated with
insect breeding, odour and public AO9.2
safety. Developments are designed to eliminate
retaining walls in excess of 0.8m for any water
quality treatment device.
Hydrology and waterway stability Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Compliance
Hydrology and waterway stability
PO10 AO10
Development prevents increased The development is designed to: Not applicable
bed and bank erosion and (a) limit the peak 1 year ARI event discharge
sedimentation in receiving within the receiving waterway to the pre-
waterways by avoiding changes development peak 1 year discharge;
in low rate, peak flow run-off and (b) maximise pervious areas by using
flow duration. pervious alternatives for otherwise
impervious areas wherever possible;
(c) provide for capture and reuse of
stormwater for non-potable purposes for
gardening, toilet flushing, laundry and hot
water supply uses;
(d) incorporate appropriate detention
features; and
(e) incorporate natural channel design
principles
Editor’s note: The Sustainable Building Design
Code includes requirements for stormwater
capture and reuse.
Page 11
Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code
PO11 AO11.1
Water sensitive urban design The design and construction of a natural channel Not applicable
principles are applied to achieve or natural channel rehabilitation works are in
multifunctional design of accordance with the Natural Channel Design
waterways, wetlands and Guidelines (Brisbane City Council) having regard
drainage lines that provide for: to local topography, geology and
(a) stormwater conveyance that geomorphology.
uses natural channel
design; AO11.2
(b) protection of landscape Landscape features, plant species and habitat
features and ecological types used in stormwater conveyance channels
important areas including are complementary to the local context and
terrestrial and aquatic natural waterways.
habitat;
(c) aesthetic and passive AO11.3
recreation values; Bank and bed stability and planting densities
(d) flood management and result in a stable channel over the long term and
conveyance of external minimal potential for pest plant species.
catchment stormwater
through the development; AO11.4
(e) landscaping that Water Sensitive Design measures are
incorporates local native incorporated into the development, as detailed in
species; and the document Water Sensitive Designs small
(f) bed and bank stability improvements, new ideas, concepts and sketch
designs for stormwater filtration systems
(Healthy Waterways Water by Design).
AO11.5
Floodplain management is designed in
accordance with the Framework for the
Integration of Flood
and Stormwater Management into Open Space
published by Healthy Waterways Water by
Design (version current at the time of
development application)
PO12 AO12.1 Complies – Please refer to the stormwater
management plan prepared by SCG Consulting
Engineers at Attachment B.
Development protects in-stream Where run-off from or within the site passes
ecology by maintaining pre- through or drains to natural
development low flow discharge channels, waterways or wetlands, development
regimes and maintaining fish protects in-steam ecology by maintaining pre-
passages. development low flow discharge regimes in
accordance with the frequent flow management
objectives in PSP6 Engineering Design
Standards - Roads, drainage and earthworks
AO12.2
Instream structures such as roads, bridges,
culverts, and other stormwater infrastructure do
not cause barriers to fish passage and facilitate
the movement of terrestrial and aquatic fauna
along waterway corridors.
AO12.3
Benthic substrate retains a continuous grade
with the direction of flow consistent with the
natural bed profile.
PO13 AO13.1 Complies – Please refer to the stormwater
Development is designed and The location and form of stormwater discharge management plan prepared by SCG Consulting
constructed to maintain surface points do not alter the pre-development Engineers at Attachment B.
and ground water balances that hydrology of receiving surface water or
sustain the environmental values groundwater.
of water dependent ecosystems,
including downstream aquatic, AO13.2
riparian, wetland and terrestrial Developments located on groundwater recharge
ecosystems. or discharge areas are designed and managed
in accordance with a groundwater recharge and
Page 12
Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code
discharge management plan prepared by a
suitably experienced and qualified groundwater
hydrologist. The groundwater recharge or
discharge must demonstrate that the
development does not affect groundwater
balances beyond the property boundaries.
Editor's Note— PSP6 Engineering Design
Standards - Roads, drainage and earthworks
provides guidance on prepare a groundwater
recharge and discharge plan.
Construction and establishment of stormwater management systems Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Compliance
Construction and establishment of stormwater management systems
PO14 AO14.1 Complies – Please refer to the erosion and sediment
control plan prepared by SCG Consulting Engineers
at Attachment B.
Construction methods provide for An erosion and sediment control plan prepared
appropriate controls to avoid entry in accordance with the International Erosion
and transport of litter, sediment, Control Association Best Practice Books
and associated prescribed water demonstrates that the capture and release of
contaminants into receiving stormwater achieves the design objectives listed
waters. in Table A: Construction phase – stormwater
management design objectives of the State
Editor's note— Water Planning Policy (Appendix 2).
contaminants are prescribed in
the Environmental Protection Act Editor’s note— PSP6 Engineering Design
1994. Standards - Roads, drainage and earthworks
provides guidance on requirements for preparing
an Erosion Management Plan.
AO14.2
Construction works are designed and managed
to restrict the extent of clearing and soil
exposure to the minimum necessary for access,
and safe construction at any one time.
AO14.3
For buildings:
(f) upstream runoff is diverted around the
construction site;
(g) sediment barriers are provided downslope
of disturbed areas to prevent sediment
washing into gutters, drains
and waterways , wetlands or drainage
lines either on or off the site; and
(h) temporary or permanent downpipes are
connected to the stormwater system
before laying the roof; or
(i) localised erosion is avoided by directing
flow from downpipes over non-erosive
areas.
AO14.4
Chemical flocculants used as part of an erosion
and sediment control plan do not harm the
environmental values within receiving waters.
AO14.5
Appropriately sized litter containment areas, with
provision for sorting recyclables are provided for
the type of litter expected to be generated onsite.
Wastewater management and effluent disposal Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Compliance
Wastewater management and effluent disposal
PO15 AO15 Not applicable
Development does not discharge Wastewater (non-sewage) generated from the
Page 13
Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code
wastewater unless it can be development is collected and contained on-site,
demonstrated to not compromise and is:
environmental values of waters
and water quality objectives. (j) lawfully disposed to sewer; or
(k) transferred off-site for treatment/disposal
Editor’s Note—Environmental to an appropriately licenced facility;
values of waters and water quality (l) reused on-site in a closed-cycle irrigation
objectives are prescribed in scheme, industrial processes, washing or
Schedule 1 of the Environmental cleaning or other purpose; or
Protection (Water) Policy 2009. (m) treated to meet the drinking water supply
environmental values prior to release.
Editor’s Note—The Plumbing and Drainage Act
2003 sets out requirements for wastewater
management.
PO16 AO16 Not applicable
On-site effluent treatment and An onsite effluent system and disposal area is: An approved effluent disposal system exists for the
disposal systems are designed, development.
constructed and managed to not (a) not located on a slope greater than 1 in
compromise the environmental (10%);
values of waters and water quality (b) not located at or below the 1% annual
objectives. exceedance probability (AEP flood event);
(c) not located within a riparian buffer
area mapped on a Biodiversity,
Waterways and Wetlands Overlay Map;
and
(d) setback 400 metres minimum from the full
supply level of Lake Macdonald.
Editor’s Note—The Plumbing and Drainage Act
2003 sets out requirements for on-site effluent
treatment and disposal. The Queensland
Plumbing and Wastewater Code and associated
guidelines are used to confirm the suitability of
each site to accommodate an on-site sewerage
facility; or where a centrally located group
collection treatment system is proposed,
confirmation as to the suitability of the
designated site to accommodate the on-
site sewerage facility. Additionally, where the
combined total peak design capacity of effluent
treatment is less than 21 equivalent persons, the
design of the system achieves a low to medium
risk classification in accordance with Seqwater’s
Land Use Risk Tool for onsite sewerage facilities.