Attachment D - Planning Scheme Statement

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Attachment C
Assessment Against the Planning Scheme – Driveways and Parking Code

   Performance Outcomes                         Acceptable Outcomes                                  Compliance
Driveways
PO1                                    AO1
Vehicular access does not              O1.1                                             Can comply – proposal plans have been
adversely impact on safety,            Vehicular access is located and designed in      prepared by SCG Consulting Engineers
capacity and operations of the         accordance with the current Australian           to demonstrate the ability to comply to
existing or planned road network,      Standards for Parking Facilities.                PO1 and are included in Attachment B.
cycleways or pedestrian pathway
systems.                               AO1.2
                                       Only one footpath crossing is provided.

                                       Editor’s Note— Justification for additional
                                       driveways may need to be supported by a
                                       detailed Traffic Study.

                                       AO1.3
                                       Driveways, have a maximum grade in
                                       accordance with Council’s standard
                                       requirements.
PO2                                    AO2                                              Can comply – proposal plans have been
Driveways and crossovers               Design and construction of driveways,            prepared by SCG Consulting Engineers
(a) are suitable and safe for          including across the footpath, is in             to demonstrate the ability to comply to
     their intended use; and           accordance with Council Standard Drawings        PO2 and are included in Attachment B.
(b) match Council infrastructure.      as appropriate for the particular type of        .
                                       development as annotated on the drawings.

                                       AO2.2
                                       The change of grades in driveways and
                                       ramps is in accordance with Council’s
                                       Standard Drawings.
PO3                                    AO3.1
The number of driveways across         Design of multi-tenanted developments            Can comply – proposal plans have been
pedestrian footpaths is                include shared      driveways     and            prepared by SCG Consulting Engineers
minimised.                             parking   areas.                                 and demonstrate that the second
                                                                                        crossover is appropriate for the site in
                                       AO3.2                                            accordance with PO3 as identified in
                                       Driveways are located so they abut existing      Attachment B.
                                       driveways of adjoining development where
                                       practicable and reciprocal easements are
                                       created to reduce the sealed driveway width.
PO4                                    AO4.1
Vehicular access does not              Footpath and kerb crossings are located          Can comply – proposal plans have been
adversely impact on the capacity,      clear of existing stormwater inlet structures,   prepared by SCG Consulting Engineers
operations and maintenance of          water and sewerage infrastructure fittings,      to demonstrate the ability to comply to
the existing infrastructure.           any other exiting utility infrastructure,        PO4 and are included in Attachment B.
                                       existing landscaping and vegetation.
PO5                                    AO5
Vehicular access does not              Vehicular access avoids disturbance to the       Can comply – proposal plans have been
adversely impact on the health         tree protection zone of trees on public land.    prepared by SCG Consulting Engineers
and integrity of existing                                                               to demonstrate the ability to comply to
landscaping or native vegetation,                                                       PO5 and are included in Attachment B.
where possible.                                                                         .
Parking and manoeuvring Table 9.4.1.3 Criteria for assessment (part)
   Performance Outcomes                         Acceptable Outcomes                                  Compliance
Parking and maneouvring
PO6                                    AO6.1
Sufficient parking                     The number of car parking spaces, motor          Complies – the dwelling and shed
(a) is provided having regard to       cycle spaces, bicycle spaces and loading         provides in excess of 2 undercover
the specifics of the use               bays is not less than the minimum number         parking spaces as detailed on the
including-                             specified in Table                               engineering plans at Attachment B.
     (i) the type and intensity of     9.4.1.4 Minimum parking requirements
         land use;                     including end of trip facilities.
    (ii) any existing parking
         available on the site;        Editor's note— with regard to the provision
   (iii) hours of operation;           of end of trip facilities, where there is a
   (iv) likely numbers of              conflict with the QDC MP 4.1 for major
         users;                        developments the QDC applies. For all other
    (v) accessibility to the site by   development Table 9.4.1.4 applies.
         means other than
Log in to download the original file

Attachment D - Planning Scheme Statement.pdf · 349 KB (small file)

Full text of the other 12 pages

Page 2

Attachment C
Assessment Against the Planning Scheme – Driveways and Parking Code

          private motor vehicle;     AO6.2
    (vi) the peak parking            Where appropriate, motorcycle spaces can be
          demand periods of          provided on site in lieu of required car parking
          uses on the site; and      spaces, excluding industry activities, at the
   (vii) the availability of         following rates:
          alternative car parking;    a) 2 motorcycle spaces provided for 0.5 car
          and                             parking space; or
  (b) is provided to                  b) 4 motorcycles spaces provided per 1 car
        accommodate the                   parking space; and
        number and type of            c) up to a maximum of 4 car parking spaces.
        vehicles and
        motorcycles likely to be     AO6.3
        generated by the             Secure and convenient parking spaces for bicycles
        development.                 are designed and provided on site in accordance
                                     with—
                                     a) AS2890.3 Bicycle Parking Facilities; and
                                     b) Cycling aspects of Austroads Guides (AP-
                                         G88-14).

                                     AO6.4
                                     Bicycle spaces and end of trip facilities need to be
                                     accessible to all users.

PO7                                  AO7.1
The layout of the development        Parking bays, manoeuvring areas, queuing areas,        Complies – the proposal will provide
provides adequate, clearly           loading, set down, pickup areas and driveways are      parking and maneuvering area in
defined and easily accessible        designed in accordance with the Australian             compliance with the relevant Australian
  (a) on-site vehicle parking        Standards for Parking Facilities.                      Standards as detailed in the engineering
      and manoeuvring areas;                                                                plans at Attachment B.
      and                            AO7.2
  (b) loading and                    Development includes purpose designed spaces
      manoeuvring areas for          for motorcycles and motor scooters, which are
      delivery and service           easily identified from the driveway of the property
      vehicles.                      and located as close as practicable to the entrance
                                     of the building on site.

PO8                                  AO8.1
Parking and manoeuvring              Parking, service areas and manoeuvring areas are       Complies – the proposal plans comply
areas are designed to                setback a minimum of 2 metres from road                with   MCU23/0053      and  incorporate
(a) not unduly conflict with         frontages to allow for landscaping, with the           appropriate landscape setbacks in the
      pedestrians; and               exception of Walter Hay Drive, Eenie Creek Road        landscape plans at Attachment C.
(b) be sufficiently setback          and Holts Road frontages, where no development
      from road frontages to         occurs within the landscaped frontage setbacks.
      not dominate the
      streetscape or                 AO8.2
      surrounding areas;             In Centre zones, parking, service and manoeuvring
(c)   allow for landscaping to       areas are either integrated within or under
      reduce the visual impact       buildings and sleeved by usable floor space, or
      of the parking, servicing      located to the rear of buildings.
      and manoeuvring
      areas;                         Editor's note— Refer to Figure AP3-11A and
(d) complement the future            Figure AP3-11B for outcomes for car parking in
      planned character of the       centres.
      area; and
(e) avoid development                AO8.3
      within the Walter Hay          Where practicable vehicle access is from rear
      Drive, Eenie Creek             laneways.
      Road and Holts Road
      frontage setbacks.

PO9                                  AO9
On-site car parking spaces are       Car parking spaces are provided for people with        Not Applicable – the proposal involves a
identified and reserved for          disabilities at the rate specified in the current      residential shed.
people with disabilities.            Australian Standards for Parking Facilities.

PO10                                 AO10                                                   Complies – the proposal will provide
Access and egress points do          Vehicle manoeuvring areas are provided in              parking and maneuvering area in
not impact on the safety and         accordance with the current Australian Standards       compliance with the relevant Australian
operations of the road system.       Australian Standards for Parking Facilities so         Standards and ensure vehicles can leave
                                     vehicles enter and leave the site in a forward gear,   in a forward gear as detailed in the
                                                                                            engineering plans at Attachment B.

Page 3

Attachment C
Assessment Against the Planning Scheme – Driveways and Parking Code

                                   excluding dual occupancy or detached dwellings
                                   on local roads.

PO11                               AO11                                                   Complies – the crossover is located in
Parking areas are designed to      At locations where pedestrian and vehicle conflicts    safe position and ensures adequate sight
 (a) provide a progressive         are likely to occur:                                   distances have been provided as detailed
      reduction in speed           a) sight distances of at least 2.5 seconds of travel   in the engineering plans at Attachment B.
      between the external              time at the designated speed are provided;
      road and internal            b) splayed corners on structures are
      parking spaces;                   incorporated;
 (b) ensure lower speeds           c) landscaping is designed to allow clear views;
      near areas of high                and
      pedestrian activity          d) sign placement ensures that sight distance
      through the use of                requirements are not impeded.
      appropriate road
      geometry or devices
      designed to limit speed;
      and
 (c) maintain sight distances
      which are appropriate
      for the likely operating
      speeds in all areas of
      potential
      pedestrian/vehicle and
      vehicle/vehicle conflict.

PO12                               AO12.1
A clearly defined pedestrian       In large open carparks with greater than 200 car       Not applicable
network is provided that –         parking spaces, a pedestrian path between parking
  (a) is located in areas          spaces is provided on every second aisle.
      where people will
      choose to walk;              AO12.2
  (b) ensures that pedestrian      For a minimum of 50% of car parking spaces,            Not applicable
      movement through car         pedestrian access to buildings is not across or
      parking areas or             through driveways, carparks, setdown or
      structures are along         manoeuvring areas.
      aisles rather than across
      them.

PO13
Provision is made for              No acceptable outcome provided                         Not applicable
pedestrian and vehicular
queues at conflict points.

PO14                               AO14
Parking areas are lit to provide   Lighting is provided in accordance with the            Not applicable
security for night-time users.     Australian Standard for Road Lighting - Vehicular
                                   Traffic (Category V) Lighting - Performance
                                   Installation and Design Requirements.
PO15                               AO15
Site facilities encourage users    End-of-trip facilities are maintained and accessible   Not applicable
and employees to access the        to all users of the premises as part of common
site by means of foot or           property.
bicycle through provision of
appropriate end of-trip
facilities including bicycle
parking and shower/change
rooms.

PO16
Development with the               No acceptable outcome provided                         Not applicable
potential to generate
significant traffic and parking
impacts gives appropriate
consideration to transport and
land use issues.

Editor’s Note—A detailed
Traffic Impact Assessment
Report may be required.

Page 4

Attachment C
Assessment Against the Planning Scheme – Driveways and Parking Code


PO17                              AO17.1
Parking and manoeuvring           Development providing less than five car parking        Can comply – proposal plans have been prepared by
areas are designed to ensure      spaces is designed so that the driveway, parking        SCG Consulting Engineers and to demonstrate the
run-off is treated to remove      and manoeuvring areas are formed to drain to            building and driveway is appropriately drained as
pollutants prior to leaving the   landscaped areas.                                       detailed in Attachment B
premises.
                                  AO17.2
                                  Development providing five or more car parking
                                  spaces is designed to incorporate stormwater
                                  treatment methods to remove water contaminants
                                  likely to runoff from the general operation of the of
                                  the driveway, parking and manoeuvring areas.

                                  Editor’s Note—Further details are provided in the
                                  Water Quality and Drainage Code.

PO18
Parking areas are designed to     No acceptable outcome provided                          Complies – The development does not require a
ensure drainage without the                                                               pump.
use of pumps or other
electrical apparatus

PO19                              AO19
Site layout and building design   Below ground components of buildings, including         Can comply – The site is appropriately landscaped
provides for soft landscaping     carparks, do not extend beyond the above ground         as detailed in Attachment C.
to be established.                footprint to allow for the provision of landscaping,
                                  particularly within building setbacks.

Page 5

Page 6

Attachment C
Assessment Against the Planning Scheme – Earthworks Code

     Performance Outcomes                            Acceptable Outcomes                                          Compliance
  Effects of works
  Drainage                              AO1
  PO1                                                                                             Can comply – proposal plans have been
  Finished surface levels ensure land   Filled or excavated areas have a minimum gradient         prepared by SCG Consulting Engineers to
  is free draining.                     of 0.5% and drain to Council’s stormwater                 demonstrate the ability to comply to PO1 and
                                        infrastructure where available, or where stormwater       are included in Attachment B.
                                        infrastructure is not available, toward the street.




  Hydraulics                            No acceptable outcome provided                            Can comply – proposal plans have been
  PO2                                                                                             prepared by SCG Consulting Engineers to
  Change to the levels on site do not                                                             demonstrate the ability to comply to PO2 and
  have an adverse impact on the                                                                   are included in Attachment B.
  flooding and drainage                                                                           .
  characteristics off-site.



  Geotechnical considerations           AO3.1
  PO3                                   Filling works are undertaken in accordance with           Can comply – proposal plans have been
  Earthworks do not result in           Council’s Planning Scheme Policy PSP6                     prepared by SCG Consulting Engineers to
  geotechnical instability on-site or   Engineering design standards - roads, drainage            demonstrate the ability to comply to PO3 and
  to nearby premises.                   and earthworks.                                           are included in Attachment B.

                                        AO3.2
                                        Where the filling is for residential, commercial or
                                        industrial purposes the works comply with
                                        Australian Standard - Guidelines for earthworks on
                                        commercial & residential development.

Local amenity                           AO4.1
PO4                                     The following control measures are implemented—           Can comply – proposal plans have been
Undertaking earthworks does not                                                                   prepared by SCG Consulting Engineers to
adversely impact on the amenity of      a) regular water spraying of exposed areas to             demonstrate the ability to comply to PO4 and
the local area by way of dust, noise or     suppress dust;                                        are included in Attachment B.
visual amenity.                         b) provision of dust stabilised or sealed internal
                                            roads;
                                        c) protective covering of exposed areas that are left
                                            for more than 2 weeks; and
                                        d) unless a development permit provides otherwise,
                                            disturbed areas are revegetated using species
                                            identified in Council's Planning Scheme
                                            Policy PSP2 Landscaping.

                                        AO4.2
                                        Earthworks are undertaken only during the hours
                                        of 7:00am to 6:00pm, Monday to Friday and
                                        7:00am to 3:00pm on Saturday. No work is
                                        undertaken on Sunday or public holidays.
  Vegetative                   waste    AO5.1
  PO5                                   Cleared vegetation is transported off-site for            Can comply – Any cleared vegetation will be
  Vegetation cleared      from     a    disposal in an approved green waste disposal              disposed of appropriately.
  development site is disposed of in    facility.
  an environmentally responsible
  manner.                               AO5.2
                                        Cleared vegetation is mulched on-site and reused
                                        for landscaping of the finished development.

                                        AO5.3
                                        Cleared vegetation is disposed of for the purpose of
                                        firewood.

                                        AO5.4
                                        Disposal of vegetative waste by burning off is
                                        avoided.
  Managing contamination risk           AO6.1
  PO6                                   Fill material is solid clean earth, free of putrescible   Complies - Fill material will come from cutting
  Materials used as fill are suitable   or refuse material, vegetation, acid sulfate              at the site.
  for development and future use of     soils, building or construction material or other
  the land and filling or excavation    material or contaminants.
  works do not result in the
  contamination of land.                AO6.2

Page 7

Attachment C
Assessment Against the Planning Scheme – Earthworks Code

                                           The site is not on the contaminated land register.




Haulage activity and amenity               No acceptable outcome provided
PO7                                                                                                   Not Applicable
Haulage of material to and from
a site ensures—

 a) minimal disturbance to
    neighbouring properties and
    properties along the haulage
    route; and
 b) Council’s road infrastructure
    including pavements is not
    adversely affected.

Extent of earthworks                       AO8
PO8                                        All earthworks, including cut and fill batters,            Complies - All earthworks will be retained
The layout of the development              retaining walls and the like are contained within the      within the site as detailed on the engineering
provides adequate, clearly defined         subject site.                                              plans prepared by SCG Consulting Engineers
and easily accessible—                                                                                at Attachment B.
a) on-site vehicle parking and
    manoeuvring areas; and
b) loading and manoeuvring areas
    for delivery and service vehicles.

  Sloping Sites                            AO9
  PO9                                      Cut or fill is less than 1.5 metres in depth relative to   Complies - All earthworks will be as approved
  On sloping sites development             the natural ground level.                                  by MCU23/0054 and appropriately follow the
  follows the natural landform                                                                        natural form as detailed on the engineering
  wherever practical and excavation                                                                   plans prepared by SCG Consulting Engineers
  or filling is minimal.                                                                              at Attachment B.
  Infrastructure             protection
  PO10                                     No acceptable outcome provided                             Complies – The earthworks will not impact on
  Earthworks                        and                                                               existing infrastructure.
  vehicular access do not adversely
  impact on the capacity, operations
  and maintenance of existing
  infrastructure.
  Environmental              protection    No acceptable outcome provided
  PO11                                                                                                Complies – The earthworks will not impact on
  Earthworks minimise any adverse                                                                     existing      infrastructure.  groundwater,
  impact         upon      groundwater,                                                               watercourses, drainage lines, wetlands, and
  watercourses,       drainage    lines,                                                              native vegetation.
  wetlands, and native vegetation.
  Dams
  PO12                                     AO12.1                                                     Complies - All earthworks will be as approved
  Dam location and construction            Where the site is in the Rural zone—                       by MCU23/0054 and not impact on the
  does not impact upon neighbouring                                                                   adjoining properties as detailed on the
  properties or road reserves, in          a) the land has a slope of less than 25% (1:4);            engineering   plans    prepared     by   SCG
  terms of—                                b) the earthworks including cut and fill batters and       Consulting Engineers at Attachment B.
   a) hydrology;                              retaining walls are setback a minimum of 50
   b) alteration of existing overland         metres from the property boundary; and
         flow paths and patterns;          c) the size of the lot is greater than 5 hectares.
   c) landslide or failure of dam wall;
         and                               AO12.2
   d) effluent disposal areas.             Where the site is in the Rural residential zone or the
                                           Rural zone and the lot is less than 5 hectares:

                                           a) the land has a slope of less than 1:6;
                                           b) the earthworks including cut and fill batters and
                                              retaining walls are setback a minimum of 20
                                              metres from the property boundary; and
                                           c) the dam work involves less than 500m³ of
                                              material.

                                           AO12.3
                                           For all other zones—
                                           No acceptable outcome provided

Page 8

Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code

Stormwater Drainage 9.4.8.3 Criteria for assessment (part)
  Performance Outcomes                   Acceptable Outcomes                                              Compliance
Stormwater drainage design
PO1                                    AO1
The development and its                A stormwater management plan is prepared           Complies – please refer to the stormwater
stormwater management system           consistent with PSP6 Engineering Design            management plan prepared by SCG Consulting
is planned and designed having         Standards - Roads, drainage and earthworks.        Engineers at Attachment B.
regard to:
(a)    the natural features of
       the site;
(b)    the need to avoid impacts
       and potential risks
       to ecologically important
       areas;
(c)    the likely effectiveness of
       erosion and sediment
       control and stormwater
       drainage measures during
       rainfall events during and
       post construction; and
(d)    the need to protect
       environmental values and
       water quality of receiving
       waters both during and post
       construction.

PO2                                    AO2.1
Stormwater drainage                    Stormwater drainage planning, design and           Complies – please refer to the stormwater
                                                                                          management plan prepared by SCG Consulting
                                                                                          Engineers at Attachment B.
infrastructure is planned,             construction is in accordance with PSP6
designed and constructed to:           Engineering Design Standards - Roads,
(a) incorporate allowance for          drainage and earthworks and the latest version
      increased flood risk and tidal   of the Queensland Urban Drainage Design
      inundation through pipework      Manual.
      as a result of climate change
     and sea level rise;               AO2.2
(b) ensure the development is          The stormwater drainage system connects to a
     adequately drained; and           lawful point of discharge in accordance
(c) ensure stormwater is               with PSP6 Engineering Design Standards -
     managed and lawfully              Roads, drainage and earthworks.
     discharged without altering
     stormwater drainage               AO2.3
     characteristics external to       Stormwater flows discharging from the
     the site.                         development are demonstrated to be consistent
                                       with pre-development characteristics.

                                       AO2.4
                                       Development provides for the management of
                                       stormwater to incorporate appropriate allowance
                                       for climate change impacts (including rainfall
                                       intensity and sea level rise), in accordance
                                       with PSP6 Engineering Design Standards –
                                       Roads, Drainage and Earthworks.
PO3                                    AO3.1                                              Complies – Please refer to the stormwater
Stormwater drainage                    Stormwater drainage infrastructure meets the       management plan prepared by SCG Consulting
infrastructure conveys run-off in a    desired standards of service for roads             Engineers at Attachment B.
manner that allows roads to            functionality set out in PSP6 Engineering Design
deliver desired standards of           Standards - Roads, Drainage and Earthworks.
service appropriate to the local
conditions and local stormwater
drainage characteristics.

PO4                                    AO4.1                                              Complies – Please refer to the stormwater
Stormwater infrastructure is           The location, design and construction of           management plan prepared by SCG Consulting
compatible with existing               stormwater drainage structures is in accordance    Engineers at Attachment B.
infrastructure, allows for             with PSP6 Engineering Design Standards -
easy access for the ongoing            Roads, drainage and earthworks.
maintenance by Council, is cost
effective across its design life.      AO4.2
                                       Where infrastructure is located on private land

Page 9

Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code

                                     an easement is dedicated over the infrastructure      a
                                     in accordance with PSP6 Engineering Design
                                     Standards - Roads, drainage and earthworks.

                                     AO4.3
                                     Any alterations or repairs to infrastructure as a
                                     result of the development are made at no cost to
                                     Council.

                                     AO4.4
                                     Development avoids stormwater inflow and
                                     infiltration to the sewer infrastructure network.

                                     AO4.5
                                     Stormwater infrastructure is designed to
                                     minimise maintenance costs and the
                                     requirement for specialized equipment for
                                     maintenance techniques.

PO5                                  AO5.1                                                     Complies – Please refer to the stormwater
                                                                                               management plan prepared by SCG Consulting
                                                                                               Engineers at Attachment B.
Stormwater drainage                  Stormwater drainage infrastructure avoids
infrastructure is aligned to avoid   crossing waterways, wetlands drainage lines
crossing waterways, wetlands,        and ecologically important areas or follows the
drainage lines and ecological        edge of existing disturbed areas.
important areas, or where it is
demonstrated this is unavoidable,    AO5.2
disturbed areas are reinstated and   Stormwater drainage infrastructure is co-located
revegetated upon completion of       with other infrastructure within a combined utility
works.                               corridor where appropriate.

                                     AO5.3
                                     Temporary vehicular crossings of waterways
                                     must be designed and constructed to be
                                     consistent with the current International Erosion
                                     Control Association Best Practice Book Series.

Table 9.4.8.3 Criteria for assessment (part)
  Performance Outcomes                   Acceptable Outcomes                                                    Compliance
Stormwater quality and protection of receiving waters
PO6                               AO6.1
Development is located,           Stormwater runoff discharging into High                      Not Applicable
designed, constructed and         Ecological Value waters as a result of
operated to protect and enhance   development causes no increase in gross
environmental values and water    pollutants, total suspended solids, total
quality of waterways, wetlands,   phosphorous or total nitrogen compared to a
lakes, ground waters and          pre-development scenario.
drainage systems.
                                  AND

Editor’s note: Environmental         AO6.2
values of waters and water quality   All stormwater runoff is treated to achieve
objectives are prescribed in         maximum removal of nutrients, gross pollutants
Schedule 1 of the Environmental      and suspended solids as determined by cost to
Protection (Water) Policy 2009       efficiency ratios. (e.g. bioretention basins must
and are identified on the State      be sized to achieve at least 80% reduction in
Planning Policy Interactive          total suspended solids, 60% reduction in total
Mapping System.                      phosphorous, 45% reduction in total nitrogen
                                     and 90% reduction in gross pollutants >5mm).

                                     OR

                                     AO6.3
                                     Developments achieve a minimum 3 drop rating
                                     consistent with the Water by Design Living
                                     Waterways Scoring Guide (Healthy Land and
                                     Water).

Page 10

Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code

                                     Editor’s note— PSP6 Engineering Design
                                     Standards - Roads, Drainage and
PO7                                  AO7.1
Water quality treatment systems      Water quality treatment systems are designed to     Not applicable
use natural processes and            be integrated into the landscape consistent with
materials, whenever possible, and    the technical design guideline published by
are integrated into development to   Healthy Land and Water Water by Design for the
enhance biodiversity and             feature. (eg. For Bioretention Basins:
landscape benefits.                  Bioretention Technical Design Guidelines
                                     (October 2014) and for Wetland Systems
                                     the Wetland Technical Design Guideline (May
                                     2017).

PO8
Water quality treatment              AO8.1                                               Not applicable
infrastructure to be dedicated as    Detailed life cycle costing is provided for the
public assets are proven to be       entire treatment train system including
suitable for its use and of a cost   replacement costs of asset parts.
effective and efficient standard.
                                     AO8.2
                                     Treatment systems dedicated as public assets
                                     are designed to minimise maintenance, renewal
                                     and adaption costs and the requirement for
                                     specialised equipment, material or maintenance
                                     techniques.

                                     AO8.3
                                     Vegetated stormwater management systems to
                                     be dedicated as public assets are established
                                     and maintained during the maintenance period
                                     to ensure optimal vegetated growth and that the
                                     functional elements of the system achieve the
                                     design function at the end of the maintenance
                                     period.

PO9                                  AO9.1                                               Not applicable
Treatment systems are designed       Free draining inlets and outlets are provided to
to eliminate or minimise health,     ensure that waters do not pond for more than 24
safety and aesthetic hazards,        hours.
including risks associated with
insect breeding, odour and public    AO9.2
safety.                              Developments are designed to eliminate
                                     retaining walls in excess of 0.8m for any water
                                     quality treatment device.

Hydrology and waterway stability           Table 9.4.8.3 Criteria for assessment (part)
  Performance Outcomes                        Acceptable Outcomes                                         Compliance
Hydrology and waterway stability
PO10                                 AO10
Development prevents increased       The development is designed to:                     Not applicable
bed and bank erosion and             (a) limit the peak 1 year ARI event discharge
sedimentation in receiving                 within the receiving waterway to the pre-
waterways by avoiding changes              development peak 1 year discharge;
in low rate, peak flow run-off and   (b) maximise pervious areas by using
flow duration.                             pervious alternatives for otherwise
                                           impervious areas wherever possible;
                                     (c)   provide for capture and reuse of
                                           stormwater for non-potable purposes for
                                           gardening, toilet flushing, laundry and hot
                                           water supply uses;
                                     (d) incorporate appropriate detention
                                           features; and
                                     (e) incorporate natural channel design
                                           principles

                                     Editor’s note: The Sustainable Building Design
                                     Code includes requirements for stormwater
                                     capture and reuse.

Page 11

Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code



PO11                                AO11.1
Water sensitive urban design        The design and construction of a natural channel    Not applicable
principles are applied to achieve   or natural channel rehabilitation works are in
multifunctional design of           accordance with the Natural Channel Design
waterways, wetlands and             Guidelines (Brisbane City Council) having regard
drainage lines that provide for:    to local topography, geology and
(a)    stormwater conveyance that   geomorphology.
       uses natural channel
       design;                      AO11.2
(b)    protection of landscape      Landscape features, plant species and habitat
       features and ecological      types used in stormwater conveyance channels
       important areas including    are complementary to the local context and
       terrestrial and aquatic      natural waterways.
       habitat;
(c)    aesthetic and passive        AO11.3
       recreation values;           Bank and bed stability and planting densities
(d) flood management and            result in a stable channel over the long term and
       conveyance of external       minimal potential for pest plant species.
       catchment stormwater
       through the development;     AO11.4
(e) landscaping that                Water Sensitive Design measures are
       incorporates local native    incorporated into the development, as detailed in
       species; and                 the document Water Sensitive Designs small
(f)    bed and bank stability       improvements, new ideas, concepts and sketch
                                    designs for stormwater filtration systems
                                    (Healthy Waterways Water by Design).

                                    AO11.5
                                    Floodplain management is designed in
                                    accordance with the Framework for the
                                    Integration of Flood
                                    and Stormwater Management into Open Space
                                    published by Healthy Waterways Water by
                                    Design (version current at the time of
                                    development application)

PO12                                AO12.1                                              Complies – Please refer to the stormwater
                                                                                        management plan prepared by SCG Consulting
                                                                                        Engineers at Attachment B.
Development protects in-stream      Where run-off from or within the site passes
ecology by maintaining pre-         through or drains to natural
development low flow discharge      channels, waterways or wetlands, development
regimes and maintaining fish        protects in-steam ecology by maintaining pre-
passages.                           development low flow discharge regimes in
                                    accordance with the frequent flow management
                                    objectives in PSP6 Engineering Design
                                    Standards - Roads, drainage and earthworks

                                    AO12.2
                                    Instream structures such as roads, bridges,
                                    culverts, and other stormwater infrastructure do
                                    not cause barriers to fish passage and facilitate
                                    the movement of terrestrial and aquatic fauna
                                    along waterway corridors.

                                    AO12.3
                                    Benthic substrate retains a continuous grade
                                    with the direction of flow consistent with the
                                    natural bed profile.
PO13                                AO13.1                                              Complies – Please refer to the stormwater
Development is designed and         The location and form of stormwater discharge       management plan prepared by SCG Consulting
constructed to maintain surface     points do not alter the pre-development             Engineers at Attachment B.
and ground water balances that      hydrology of receiving surface water or
sustain the environmental values    groundwater.
of water dependent ecosystems,
including downstream aquatic,       AO13.2
riparian, wetland and terrestrial   Developments located on groundwater recharge
ecosystems.                         or discharge areas are designed and managed
                                    in accordance with a groundwater recharge and

Page 12

Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code

                                      discharge management plan prepared by a
                                      suitably experienced and qualified groundwater
                                      hydrologist. The groundwater recharge or
                                      discharge must demonstrate that the
                                      development does not affect groundwater
                                      balances beyond the property boundaries.

                                      Editor's Note— PSP6 Engineering Design
                                      Standards - Roads, drainage and earthworks
                                      provides guidance on prepare a groundwater
                                      recharge and discharge plan.

Construction and establishment of stormwater management systems Table 9.4.8.3 Criteria for assessment (part)
   Performance Outcomes                Acceptable Outcomes                            Compliance
Construction and establishment of stormwater management systems

PO14                                  AO14.1                                                Complies – Please refer to the erosion and sediment
                                                                                            control plan prepared by SCG Consulting Engineers
                                                                                            at Attachment B.
Construction methods provide for       An erosion and sediment control plan prepared
appropriate controls to avoid entry   in accordance with the International Erosion
and transport of litter, sediment,    Control Association Best Practice Books
and associated prescribed water       demonstrates that the capture and release of
contaminants into receiving           stormwater achieves the design objectives listed
waters.                               in Table A: Construction phase – stormwater
                                      management design objectives of the State
Editor's note— Water                  Planning Policy (Appendix 2).
contaminants are prescribed in
the Environmental Protection Act      Editor’s note— PSP6 Engineering Design
1994.                                 Standards - Roads, drainage and earthworks
                                      provides guidance on requirements for preparing
                                      an Erosion Management Plan.

                                      AO14.2
                                      Construction works are designed and managed
                                      to restrict the extent of clearing and soil
                                      exposure to the minimum necessary for access,
                                      and safe construction at any one time.

                                      AO14.3
                                      For buildings:
                                      (f)   upstream runoff is diverted around the
                                            construction site;
                                      (g)   sediment barriers are provided downslope
                                            of disturbed areas to prevent sediment
                                            washing into gutters, drains
                                            and waterways , wetlands or drainage
                                            lines either on or off the site; and
                                      (h)   temporary or permanent downpipes are
                                            connected to the stormwater system
                                            before laying the roof; or
                                      (i)   localised erosion is avoided by directing
                                            flow from downpipes over non-erosive
                                            areas.

                                      AO14.4
                                      Chemical flocculants used as part of an erosion
                                      and sediment control plan do not harm the
                                      environmental values within receiving waters.

                                      AO14.5
                                      Appropriately sized litter containment areas, with
                                      provision for sorting recyclables are provided for
                                      the type of litter expected to be generated onsite.

Wastewater management and effluent disposal Table 9.4.8.3 Criteria for assessment (part)
 Performance Outcomes                Acceptable Outcomes                                 Compliance
Wastewater management and effluent disposal
PO15                              AO15                                                      Not applicable
Development does not discharge    Wastewater (non-sewage) generated from the

Page 13

Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code

wastewater unless it can be          development is collected and contained on-site,
demonstrated to not compromise       and is:
environmental values of waters
and water quality objectives.        (j)    lawfully disposed to sewer; or
                                     (k)    transferred off-site for treatment/disposal
Editor’s Note—Environmental                 to an appropriately licenced facility;
values of waters and water quality   (l)    reused on-site in a closed-cycle irrigation
objectives are prescribed in                scheme, industrial processes, washing or
Schedule 1 of the Environmental             cleaning or other purpose; or
Protection (Water) Policy 2009.      (m)    treated to meet the drinking water supply
                                            environmental values prior to release.

                                     Editor’s Note—The Plumbing and Drainage Act
                                     2003 sets out requirements for wastewater
                                     management.
PO16                                 AO16                                                 Not applicable
On-site effluent treatment and       An onsite effluent system and disposal area is:      An approved effluent disposal system exists for the
disposal systems are designed,                                                            development.
constructed and managed to not       (a)    not located on a slope greater than 1 in
compromise the environmental                (10%);
values of waters and water quality   (b)    not located at or below the 1% annual
objectives.                                 exceedance probability (AEP flood event);
                                     (c)    not located within a riparian buffer
                                            area mapped on a Biodiversity,
                                            Waterways and Wetlands Overlay Map;
                                            and
                                     (d)    setback 400 metres minimum from the full
                                            supply level of Lake Macdonald.

                                     Editor’s Note—The Plumbing and Drainage Act
                                     2003 sets out requirements for on-site effluent
                                     treatment and disposal. The Queensland
                                     Plumbing and Wastewater Code and associated
                                     guidelines are used to confirm the suitability of
                                     each site to accommodate an on-site sewerage
                                     facility; or where a centrally located group
                                     collection treatment system is proposed,
                                     confirmation as to the suitability of the
                                     designated site to accommodate the on-
                                     site sewerage facility. Additionally, where the
                                     combined total peak design capacity of effluent
                                     treatment is less than 21 equivalent persons, the
                                     design of the system achieves a low to medium
                                     risk classification in accordance with Seqwater’s
                                     Land Use Risk Tool for onsite sewerage facilities.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.