Original source · versioned page text
Attachment D - Planning Scheme Statement
Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code
discharge management plan prepared by a
suitably experienced and qualified groundwater
hydrologist. The groundwater recharge or
discharge must demonstrate that the
development does not affect groundwater
balances beyond the property boundaries.
Editor's Note— PSP6 Engineering Design
Standards - Roads, drainage and earthworks
provides guidance on prepare a groundwater
recharge and discharge plan.
Construction and establishment of stormwater management systems Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Compliance
Construction and establishment of stormwater management systems
PO14 AO14.1 Complies – Please refer to the erosion and sediment
control plan prepared by SCG Consulting Engineers
at Attachment B.
Construction methods provide for An erosion and sediment control plan prepared
appropriate controls to avoid entry in accordance with the International Erosion
and transport of litter, sediment, Control Association Best Practice Books
and associated prescribed water demonstrates that the capture and release of
contaminants into receiving stormwater achieves the design objectives listed
waters. in Table A: Construction phase – stormwater
management design objectives of the State
Editor's note— Water Planning Policy (Appendix 2).
contaminants are prescribed in
the Environmental Protection Act Editor’s note— PSP6 Engineering Design
1994. Standards - Roads, drainage and earthworks
provides guidance on requirements for preparing
an Erosion Management Plan.
AO14.2
Construction works are designed and managed
to restrict the extent of clearing and soil
exposure to the minimum necessary for access,
and safe construction at any one time.
AO14.3
For buildings:
(f) upstream runoff is diverted around the
construction site;
(g) sediment barriers are provided downslope
of disturbed areas to prevent sediment
washing into gutters, drains
and waterways , wetlands or drainage
lines either on or off the site; and
(h) temporary or permanent downpipes are
connected to the stormwater system
before laying the roof; or
(i) localised erosion is avoided by directing
flow from downpipes over non-erosive
areas.
AO14.4
Chemical flocculants used as part of an erosion
and sediment control plan do not harm the
environmental values within receiving waters.
AO14.5
Appropriately sized litter containment areas, with
provision for sorting recyclables are provided for
the type of litter expected to be generated onsite.
Wastewater management and effluent disposal Table 9.4.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Compliance
Wastewater management and effluent disposal
PO15 AO15 Not applicable
Development does not discharge Wastewater (non-sewage) generated from the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original