Attachment D - Planning Scheme Statement
Attachment C
Assessment Against the Planning Scheme – Water Quality and Drainage Code
wastewater unless it can be development is collected and contained on-site,
demonstrated to not compromise and is:
environmental values of waters
and water quality objectives. (j) lawfully disposed to sewer; or
(k) transferred off-site for treatment/disposal
Editor’s Note—Environmental to an appropriately licenced facility;
values of waters and water quality (l) reused on-site in a closed-cycle irrigation
objectives are prescribed in scheme, industrial processes, washing or
Schedule 1 of the Environmental cleaning or other purpose; or
Protection (Water) Policy 2009. (m) treated to meet the drinking water supply
environmental values prior to release.
Editor’s Note—The Plumbing and Drainage Act
2003 sets out requirements for wastewater
management.
PO16 AO16 Not applicable
On-site effluent treatment and An onsite effluent system and disposal area is: An approved effluent disposal system exists for the
disposal systems are designed, development.
constructed and managed to not (a) not located on a slope greater than 1 in
compromise the environmental (10%);
values of waters and water quality (b) not located at or below the 1% annual
objectives. exceedance probability (AEP flood event);
(c) not located within a riparian buffer
area mapped on a Biodiversity,
Waterways and Wetlands Overlay Map;
and
(d) setback 400 metres minimum from the full
supply level of Lake Macdonald.
Editor’s Note—The Plumbing and Drainage Act
2003 sets out requirements for on-site effluent
treatment and disposal. The Queensland
Plumbing and Wastewater Code and associated
guidelines are used to confirm the suitability of
each site to accommodate an on-site sewerage
facility; or where a centrally located group
collection treatment system is proposed,
confirmation as to the suitability of the
designated site to accommodate the on-
site sewerage facility. Additionally, where the
combined total peak design capacity of effluent
treatment is less than 21 equivalent persons, the
design of the system achieves a low to medium
risk classification in accordance with Seqwater’s
Land Use Risk Tool for onsite sewerage facilities.