Assessment Against the Planning Scheme – Earthworks Code
The site is not on the contaminated land register.
Haulage activity and amenity No acceptable outcome provided
PO7 Not Applicable
Haulage of material to and from
a site ensures—
a) minimal disturbance to
neighbouring properties and
properties along the haulage
route; and
b) Council’s road infrastructure
including pavements is not
adversely affected.
Extent of earthworks AO8
PO8 All earthworks, including cut and fill batters, Complies - All earthworks will be retained
The layout of the development retaining walls and the like are contained within the within the site as detailed on the engineering
provides adequate, clearly defined subject site. plans prepared by SCG Consulting Engineers
and easily accessible— at Attachment B.
a) on-site vehicle parking and
manoeuvring areas; and
b) loading and manoeuvring areas
for delivery and service vehicles.
Sloping Sites AO9
PO9 Cut or fill is less than 1.5 metres in depth relative to Complies - All earthworks will be as approved
On sloping sites development the natural ground level. by MCU23/0054 and appropriately follow the
follows the natural landform natural form as detailed on the engineering
wherever practical and excavation plans prepared by SCG Consulting Engineers
or filling is minimal. at Attachment B.
Infrastructure protection
PO10 No acceptable outcome provided Complies – The earthworks will not impact on
Earthworks and existing infrastructure.
vehicular access do not adversely
impact on the capacity, operations
and maintenance of existing
infrastructure.
Environmental protection No acceptable outcome provided
PO11 Complies – The earthworks will not impact on
Earthworks minimise any adverse existing infrastructure. groundwater,
impact upon groundwater, watercourses, drainage lines, wetlands, and
watercourses, drainage lines, native vegetation.
wetlands, and native vegetation.
Dams
PO12 AO12.1 Complies - All earthworks will be as approved
Dam location and construction Where the site is in the Rural zone— by MCU23/0054 and not impact on the
does not impact upon neighbouring adjoining properties as detailed on the
properties or road reserves, in a) the land has a slope of less than 25% (1:4); engineering plans prepared by SCG
terms of— b) the earthworks including cut and fill batters and Consulting Engineers at Attachment B.
a) hydrology; retaining walls are setback a minimum of 50
b) alteration of existing overland metres from the property boundary; and
flow paths and patterns; c) the size of the lot is greater than 5 hectares.
c) landslide or failure of dam wall;
and AO12.2
d) effluent disposal areas. Where the site is in the Rural residential zone or the
Rural zone and the lot is less than 5 hectares:
a) the land has a slope of less than 1:6;
b) the earthworks including cut and fill batters and
retaining walls are setback a minimum of 20
metres from the property boundary; and
c) the dam work involves less than 500m³ of
material.
AO12.3
For all other zones—
No acceptable outcome provided