Decision Notice - 010.2007.00002521.001 [As Published] · 132007.2521

of 7

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                   3 of 7




                                      Noosa Council Conditions
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.     Development undertaken in accordance with this approval must generally comply with the approved plans
       of development. The approved plans are titled and numbered Upper Ground Floor & Site Plan, DRG 1-8;
       Lower Ground Floor Plan, DRG 2-8; First Floor Plan, DRG 3-8; East & West Elevation, DRG 4-8; South &
       North Elevation, DRG 5-8; Upper Ground Floor Dimensions, DRG 6-8; Lower Ground Floor Dimension,
       DRG 7-8; and First Floor Dimensions, DRG 8-8 prepared by David H Denham and dated November 2007
       and as may be amended by these conditions and annotations on the plans.

2.     The development must be undertaken and operated in a manner that causes no detrimental effect upon
       the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
       emissions.

3.     A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to service the
       detached house. The tank is to be installed to ensure water from the tank can be used both:

       3.1.   For external use such as watering gardens, irrigation, ornamental ponds or water features, topping
              up swimming pools, outdoor cleaning; and

      5.2      For use in flushing of toilets internal to the building.

4.     All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
       (LPG or natural).

5.     The building height shall not exceed 8.0 metres above natural ground level.

6.     A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
       with Council at       completion of work confirming compliance with the maximum allowable building
       height as required by either the conditions of     approval or the Planning Scheme.

7.     A minimum of 20% of the site shall be retained as soft landscaping.

8.     Existing trees on the site and within road reserves are to be retained, except where required to be
       removed due to building operations or the conduct of the approved use. In this regard, the removal of
       vegetation shall not extend beyond 3 metres of the building footprint of the Detached House.

9.     Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
       constructed under overhead electricity transmission lines, or within any easements.
Demolition or Relocation of Existing Dwelling
10.    Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be protected from
       damage and made safe to the standard required by the regulatory authority;

11.    All infrastructure must be disconnected, capped or sealed including:-
              electricity meters removed and electrical wires disconnected; and

              telephone lines are disconnected; and

              high speed data cables and television provider boxes are disconnected and removed to the
              standard required by the regulatory authority;


12.    All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
       must be removed from the building and disposed of in accordance with industry best practice.

13.    Waste generated during construction must be stockpiled in a centralised location and covered as required
       to prevent material being blown onto adjoining properties including the road reserve or food waste from
       generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly
       or via an approved waste receptacle and collection service. Storage areas are to be located near the
       temporary access to the site so that access can be gained with out damage to infrastructure.



MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec124164\@[email protected]

Used in these records

About this file

File size
31 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00002521.001 [As Published].pdf · 31 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.