14.    All building materials containing asbestos products must be disposed on in accordance with industry best
       practice.

15.    A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel;

16.    Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the
       relocation site or between the sites must be repaired or reinstated to at least pre-existing conditions.

17.    Sediment and erosion control measures must be placed on site prior to the works commencing and shall
       be maintained until all works are complete. The erosion and sediment control measures shall be in
       accordance with the “Best practice guidelines for control of stormwater on building sites” prepared by
       Healthy Waterways (copy attached or available at www.healthywaterways.org).

18.    All disturbed areas must be revegetated or otherwise stabilised at the completion of the works. Disturbed
       areas are revegetated using species identified in PSP3 – Landscaping Plants and Guidelines.

19.    The transportation of all materials to and from the site must be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site
       shall be covered to prevent materials including dust being windblown from the vehicle.

20.    A Waste Management Plan shall be submitted for the demolition to the Land Use Section of Noosa
       Council, prior to the development permit for building works being issued. The Plan shall contain the
       following information:-
       MATERIALS ON-SITE                             DESTINATION
                                                     Re-use and Recycling            Disposal
       Expected     waste    Estimated volume (m³)   On-site       *specify   Off-site   *specify   *Specify contractor
       materials                                     proposed   reuse or      contractor       &    & landfill site
                                                     onsite       recycling   recycling outlet
                                                     methods
       Excavation material
       Green waste
       Bricks
       Concrete
       Timber – please
       specify
       Plasterboard
       Metals – please
       specify
       Asbestos
       Other – please
       specify
       NOTE: Details of site area to be used for onsite separation, treatment and storage (including weather
       protection) shall be provided on the plan drawings accompanying your application.

Currency
21.    The Development Permit for a material change of use lapses if the use has not happened by 17
       December 2011, unless an application to extend the currency is approved by Council.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec124164\@[email protected]

Used in these records

About this file

File size
31 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00002521.001 [As Published].pdf · 31 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.