Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2184scrcresponse2a

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

| MAX WATTERSON+ASSOCIATES

CONSULTING SURVEYORS & PLANNERS

 

12" September, 2013
Ref: 06-2184
Your Ref: JLO13:JL:MCU12/0184
The Chief Executive Officer
Sunshine Coast Regional Council
Locked Bag 72
SUNSHINE COAST MAIL CENTRE Q 4560

Attention: Jack Lewis
Dear Sir,

Re: Development Application for Material Change of Use (MCU12/0184)
(Animal Husbandry Type 2) — Poultry Farm
Environmentally Relevant Activity (ERA12/0087)
Lot 21 on SP226606 — 136 Top Forestry Road, Ridgewood
Applicant: W Donald Milligan Pty Ltd.

| refer to the above-mentioned matter and your email containing an Outstanding Issues
Request dated 28" June, 2013; and | respectfully supply the following documents:

1) A Preliminary Operational Management Plan has been prepared by MWA
Environmental, (Job No. 12-002 dated qi September, 2013). The Plan
addresses the integration of the poultry farm operation with the avocado orchard
operation. The Plan also includes correspondence prepared by Alwyn Peffer &
Company Pty Ltd regarding an audit of the tree count and nutrient calculations
prepared by Myriad International Pty Ltd which concludes that the composted
material produced will not meet the demands of the orchard.

2) An additional response prepared Hayes Traffic Engineering (dated 5m August,
2013) and an updated Traffic Engineering Report (Project 11347 — Version DA
RF102 dated August 2013) incorporating the additional response required by
Council.

3) An additional response prepared by MWA Environmental regarding Odour Issues
(dated qe September, 2013) addressing the issue of odour generated by the
composting operation.

4) An amended Stormwater Treatment and Water Quality Management Plan
prepared by Callaghan & Toth - Civil, Hydraulic & Environmental Engineers (Ref:
No. 1209 SWQMP Report_Version_2 2013 dated August 2013). The amended
Management Plan includes additional bunded areas set aside for the compost
operation.

| also refer to additional issues raised by late submissions lodged at Council; in particular
the multiple submissions by Mr Rod Ritchie and the submission by Cr Tony Wellington
(“More Chooky Business” dated 16" July, 2013).

Fruit Tree Audit

As stated above an audit of the tree count is included in the Preliminary Operational
Management Plan with a tree count of 6,651 avocado trees in the orchard engaged in
the current production of fruit.

PRINCIPAL 12 Maple Street (PO Box 639) Cooroy Q 4563 ABN 59 847 644 252
Max L. Watterson PH 07 5442 6121
Cadastral Surveyor (QId) FAX 07 5442 5125

B.Surv(UNSW). M.S.S.S.1 EMAIL [email protected]
Log in to download the original file

2184scrcresponse2a.pdf · 1.3 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.