Table 1: Stability Risk Levels
Risk Level Example Implications(1)
VH VERY HIGH RISK Unacceptable without treatment. Extensive detailed
investigation and research, planning and implementation
of treatment options essential to reduce risk to Low; may
be too expensive and not practical. Work likely to cost
more than value of property.
H HIGH RISK Unacceptable without treatment. Detailed investigation,
planning and implementation of treatment options required
to reduce risk to Low. Work would cost a substantial sum
in relation to the value of the property.
M MODERATE RISK May be tolerated in certain circumstances (subject to
regulators’ approval) but requires investigation, planning
and implementation of treatment options to reduce risk to
Low. Treatment options to reduce to Low risk should be
implemented as soon as practicable.
L LOW RISK Usually acceptable to regulators. Where treatment has
been required to reduce the risk to this level, ongoing
maintenance required.
VL VERY LOW RISK Acceptable. Manage by normal slope maintenance
procedures.
Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
depend on the nature of the property at risk; these are only given as a general guide.
5.2 Earthworks
5.2.1 Excavation
We understand that the proposed earthworks for the development comprise cutting to depths of up to a
maximum of about 5 m for the basement car park. The toe of the excavation will be setback at least 5 m
from the side boundaries and a minimum of 8 m from the steep dune face. Such excavations should
encounter very loose to loose sand grading to medium dense sand that should be excavatable using
conventional earthmoving equipment.
The sands encountered at this site should stand unsupported at slopes of about 1V:2H in the short-term
provided that groundwater seepage is not encountered and batters are protected from erosion. Given the
boundary setbacks mentioned above, trimming of excavation batters should be achievable at the specified
slopes, however should temporary support be required we understand that sheet piles are the preferred
shoring method.
The use of sheet piles would require consideration of the impact from vibrations on adjacent structures and
underground services. It is recommended that pre-drilling be undertaken to prevent vibration impacts from
sheet piling. A dilapidation survey of adjoining structures and pavements should be carried out prior to sheet
piling. It would be prudent to conduct vibration monitoring, at least during the initial stages of sheet piling, to
confirm the vibration impacts.
December 2008
Report No. 087682058 002 Rev.1 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
081128 - Lots 5 - 8 Soil Tests.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.