LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA Section 5.4 below provides advice and design parameters for retaining structures, however detailed design and construction advice should be obtained from a specialist contractor. This should include potential impact on adjacent buildings and services. Design drawings provided by Tate indicate that a ‘working platform’ comprising a minimum 150 mm thick layer of CBR15 material will be placed across the building area following bulk earthworks and compacted to 95% of the Maximum Standard Dry Density. Furthermore, the drawings indicate that assessment of the subgrade shall be carried out by DCP testing following construction of the working platform. 5.2.2 Filling The sand materials excavated from the site should be suitable for re-use as structural fill, provided any deleterious and/or organic materials are excluded. Fill should be compacted at moisture contents within the range of -2% to +1% of optimum moisture content for Standard Compaction. Select fill should have a maximum particle size of 100 mm for an uncompacted layer thickness of 200 mm and should be compacted by repeated rolling to achieve a dry density ratio of at least 95% of the Maximum Standard Dry Density for cohesive soils, or 75% Dry Density Index (DDI) for cohesionless soils. Further details for control and testing of fill are given in Australian Standard AS 3798-1996 "Guidelines on Earthworks for Commercial and Residential Developments". Our experience in similar ground conditions indicates that the achievement of 75% DDI in ‘clean’ dune sands will require the application of significant water and vibration, together with confinement of the layer under compaction. 5.3 Footings The results of our investigation indicate that medium dense (or denser) natural sands occur below about 0.4 m to 2.3 m depth across the site. Given the depth of the proposed basement excavation, such sands should occur across the building subgrade level following bulk earthworks. Conventional high level strip or pad footings may be used where there is a medium dense sand foundation. Strip or pad footings founded in the medium dense sand may be designed using an allowable bearing capacity of 200 kPa, with resultant settlements less than 25 mm. Golder Associates should carry out inspection and testing of the foundations during construction in order to confirm the allowable bearing capacity. All footings should found such that they are not adversely affected by any adjacent excavations batter slopes, trenches, or retaining walls that are not designed to support building loads. To minimise the potential for any adverse interaction effects, footings should found at least below a plane extending 1 m horizontally from the base of trenches/batter slopes/excavations/retaining walls, then rising up at 1V:2H, as illustrated in the following diagram. December 2008 Report No. 087682058 002 Rev.1 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
081128 - Lots 5 - 8 Soil Tests.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.