081128 - Lots 5 - 8 Soil Tests · OPW18/0155
Attached to the e-mail Operational Works Application - Geotechnical Report.msg.
Very large file (15.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
LOTS 5 TO 8, SETTLERS COVE, SERENITY CLOSE, NOOSA
TRENCH BACKFILL
GROUND LEVEL
FOUND FOOTINGS
TRENCH SIDEWALL BELOW THIS LINE
45°
1.0m
1.0m
SEWER / STORMWATER PIPE
If any soil conditions encountered during excavations or piling are found to differ from those noted in the
geotechnical investigation, Golder Associates should be notified immediately, and an inspection carried out
to determine if changes to design are required.
5.4 Retaining Structure Design
The design of any retention system for this site should be conducted with due consideration of embedded
depth below the excavation level (ie. cantilever for sheet piles), variability in stratigraphy over the anchor
embedment length and anticipated ground conditions. Temporary support design must also take into
account the position of adjoining building foundations and underground services. It would be necessary to
gain permission from adjacent site owners and Noosa Council to install anchors below ground level into
adjoining properties.
Retaining structure design may be carried out using a triangular pressure distribution applicable to the wall
type (ie. active pressures for a cantilever wall or at rest pressures for a propped/anchored wall) and based
on the parameters in Table 3. The values in Table 3 assume that the walls are fully drained and no
allowance is included for construction loading, adjacent foundation loadings, the effect of sloping ground, or
backfill compaction stresses.
Table 2: Retaining Structure Design Parameters
Retained Material Unit Weight Friction Lateral Earth Pressure Coefficient
(t/m3) Angle (º)
Ka Ko Kp
Loose to Medium 1.8 28 0.36 0.5 2.7
Dense Sand
Compacted Fill * * * * *
Note: * Variable dependent upon the type of material used and the degree of compaction achieved.
Positive permanent drainage must be installed behind retaining walls.
December 2008
Report No. 087682058 002 Rev.1 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
081128 - Lots 5 - 8 Soil Tests.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.