Attachment 3 - 20150352 - Decision Notice

Attached to the e-mail Industrial Business Type 2 Production, Alteration, Repackaging & Repairing - MCU19/0011.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                                                Assessment Managers Conditions:

General:
Pursuant to the provisions of the Sustainable Planning Act 2009 and the Building Act 1975, permission to undertake the
building work as outlined above is subject to the following conditions:

1.    The builder must ensure a notice of inspection is given to Pacific BCQ, (Ph: 5412 1520) before proceeding past
      the following stages of construction.

Please note: a minimum of 24 Hours’ Notice is required for inspections, work is not to progress past a mandatory
   stage until Pacific BCQ or a competent person lawfully acting on our behalf has given authority to proceed.

 Mandatory STAGE                                                                                     undertaken by

 Building General
                                                                                                    Pacific
 Footing excavations (including pier holes) with reinforcing steel in place, prior to the
                                                                                                    BCQ
 placement of concrete.
                                                                                                    RPEQ*
 Building set out, confirming the siting of the building/s in accordance with the boundary          Registered
 clearance shown on the approved plans, prior to the placement of concrete.                         Surveyor
                                                                                                    Pacific
 Slabs, including suspended slabs, with formwork and reinforcing steel in place prior to the
                                                                                                    BCQ
 placement of concrete.
                                                                                                    RPEQ*
                                                                                                    Pacific
 Masonry Block Work, with reinforcing steel in place, prior to the placement of concrete.           BCQ
                                                                                                    RPEQ*
                                                                                                    Pacific
 Framing, including structural members, tie-down and bracing prior to the installation of
                                                                                                    BCQ
 linings.
                                                                                                    RPEQ*
                                                                                                    Pacific
 Final, on completion of all works relating to this approval.
                                                                                                    BCQ
                                                                                                    Pacific
 As may be required by the Building Certifier.
                                                                                                    BCQ
 Inspections will be undertaken in accordance with the Guidelines for inspection of Class 2 to 9 Buildings Version 1
 as published by Dept. of Housing and Public Works dated 29/06/2012.
 Where inspections are to be undertaken by Registered Professional Engineer of Queensland (RPEQ*), Pacific BCQ
 must be advised of their Name and Registration Number prior to the event.

2.    Certification and Documentation: The following certificates of inspection and compliance and or additional
      documentation is to be submitted from a suitably qualified person prior to the issue of a Form 11 – Certificate of
      Classification, or prior to proceeding past the nominated stage of work:

                                                CERTIFICATE TYPE                                               REQUIRED
 Registered Professional Engineer of Queensland (RPEQ*)certificates of satisfactory inspection of:
 Footings (including pier holes).                                                                                Form 16
 Floor Slabs (including suspended slabs).                                                                        Form 16
 Masonry Block Work.                                                                                             Form 16
 Structural (framing bracing and tie down).                                                                      Form 16
 Registered Land Surveyor certificates of confirmation covering the following elements:
 Set-out.                                                                                                        See Note 2
 Competent Persons Design or Aspect Certificates (as indicated) covering the following elements:
 Termite Barrier installation including diagram of treated areas.                                                Form 16
 Roof Trusses and Truss Layout.                                                                                  Form 15
 Glass and window.                                                                                               Form 15
 Waterproofing application.                                                                                      Form 16
 Electrical systems: Emergency lighting                                                                          See Note 2
 Electrical systems: Exit signs                                                                                  See Note 2
 Hydraulic systems: Fire hose reels                                                                              Form 16


                                                                Page 2 of 7
Log in to download the original file

Attachment 3 - 20150352 - Decision Notice.pdf · 152 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.