Attachment 3 - 20150352 - Decision Notice

Attached to the e-mail Industrial Business Type 2 Production, Alteration, Repackaging & Repairing - MCU19/0011.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

 Mechanical Systems: Mechanical ventilation and air handling systems.                                                            Form 16
 Passive fire systems: Selection and installation of portable fire extinguishers and fire blankets.                              Form 16
 Final Certificate - Water Supply and Sanitary Plumbing and Drainage
 Other certificates as maybe required at the direction of the Building Certifier during the course of works.                     See Note 3
 Additional Documentation:
      Nil                                                                                                                         See Note 3
 Note 1: Acceptability of certificates/documents is at the discretion of the Building Certifier, acceptance of certificates is subject to the
 suitably qualified person being recognized as competent prior to certification of the building element.
 Note 2: Written confirmation signed by the Registered or Licensed person or manufacturers printed specification is acceptable.
 Note 3: The Building Certifier may require additional certification and or documentation under certain circumstances and will advise
 of the requirement as the need arises.

3.      All works subject to this approval are to be completed, inclusive of satisfactory final inspection and submission of
        all certificates / documentation, no later than 2 years after the date of approval or this approval will lapse.
        Where lapsing occurs, a new Development Approval will be required to continue or finalise the assessable
        development and such approval may require compliance with any subsequent legislative amendments.

4.      All building work shall comply with the Building Act 1975 and the Conditions of this Decision Notice and shall be in
        accordance with the approved plans and specifications including any amendments or conditions shown in red. All
        conditions must be satisfied prior to the issue of a Form 17 and or Form 11 – Certificate of Classification.

5.      This approval is issued on the basis of assessment against the Deemed to Satisfy Provisions of the BCA, a certified
        legible copy of the approved drawings and specifications is to be on the building site, available for inspection by the
        Building Certifier at all times.

6.      Submission of a further application for approval in relation to any proposed alteration or modification of any drawing
        or specification pertaining to this approval.

7.      On completion, the building or structure may only be used for purposes pursuant to the abovementioned
        Classification as defined by the BCA.

Water & Sewer Infrastructure:

8.      All services that may be affected by this construction shall be accurately located for alignment and/or depth prior to
        commencement of works. Where sewer or stormwater access chambers are located within the property they are to
        remain uncovered and accessible during and after construction. Should difficulty arise in locating any service please
        contact relevant authority.

9.      This approval does not include water connection; in most instances a separate application will be required from the
        relevant authority.

Stormwater:

10.     Stormwater off roofed areas (including rainwater tank overflows) is to be collected and discharged to protect the
        building and other property (including neighbouring allotments) from adverse effects. The method of stormwater
        disposal shall be in accordance with relevant local authority requirements.

        In general stormwater off roofed areas is to be collected and discharged as follows:

        (i)     To a system of inter-allotment or subdivisional drainage.

        (ii)    Where inter-allotment or subdivisional drainage is not available the stormwater is to be discharged via
                an underground pipe to the street channel;

        (iii)   Where grade or site characteristics do not permit the stormwater to be piped to a system of
                inter-allotment or subdivisional drainage or the street channel, it is to be discharged via an underground pipe
                with bubbler outlet or stormwater rubble pit located at least 3.0 metres on the downstream side of building
                foundations and no closer than 3.0 metres from any adjacent buildings, structures or property boundaries in
                a manner so as to cause minimum inconvenience to adjoining property owners.

11.     The proposed roof area shall be provided with a complete drainage system and the gutters and downpipes shall be
        connected by underground pipe to the stormwater drainage system shown on the approved plans.



                                                                  Page 3 of 7
Log in to download the original file

Attachment 3 - 20150352 - Decision Notice.pdf · 152 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.