23. When requested by Council, a Noise Impact Assessment Report (NIAR) showing monitoring
and recording of noise levels must be undertaken to investigate any complaint (other than a
frivolous or vexatious complaint) caused by noise emissions from operations at the premises.
Such monitoring must be undertaken within a reasonable and practicable timeframe
nominated by Council and be performed by a suitably qualified person in accordance with
accepted guidelines and standards. The report must be submitted to Council detailing the
results of such monitoring and recommendations for any measures to achieve compliance
with limits outlined in Table 1 of this Decision Notice.
For the purpose of measuring and certifying relevant noise conditions and reporting (e.g.
mechanical plant and equipment, a/c units, motors, refrigeration equipment, compressors,
pumps, rooftop plant and equipment. etc) a suitably qualified person is either:
i) a Registered Professional Engineer of Queensland, or
ii) an environmental consultant with a minimum of three (3) years current experience in
the field of acoustics.
Public Health Act 2005 - Rainwater Tanks
24. In accordance with the Public Health Act 2005, rainwater tanks must be constructed with
mosquito proof screens (made from either brass, copper, aluminium or stainless steel), and
constructed with a mesh size of no more than 1mm, and must be installed in a way that does
not accelerate corrosion. Tanks that contain flap valves must be installed so that when
closed, mosquitoes cannot pass through the valve. It is unlawful under the Public Health Act
2005 to construct, install or be in possession of a tank that does not comply with these
requirements.
25. Where it is intended to use rainwater for drinking purposes, a suitable treatment system is
required to be installed to disinfect or treat the water to microbiological and physical
standards as described in the current Australian Drinking Water Guidelines 2011 to make it
fit for drinking purposes.
Refuse
26. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and
Industrial Premises”, including an external imperviously paved area correctly sized for all
refuse and recycling containers and suitably screened from public places and neighbouring
properties.
Additional Conditions
20 July 2023
27. No signage is to be provided on the development site or road reserve advertising the café.
28. Prior to the Final Certificate being issued for the building works ancillary café, a car parking
plan is to be provided demonstrating compliance with Conditions 14 -18.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
PLANNING
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
Page 5 of 9
Document Set ID: 22512549
Version: 5, Version Date: 26/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Council Meeting - Decision Notice - Minor Change - MCU16 0090 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 174 KB (small file)
- File type
No other editions are linked here.