Landscaping Works
9. A minimum of 20% of the site must be retained as soft landscaping.
10. Existing vegetation in the road reserve must be retained, unless written authorisation
from Council is granted for the clearing.
Flood Immunity and Earthworks
11. The minimum floor levels of all new habitable rooms must be at least 300 millimetres
above the Defined Flood Event – 1% AEP.
Site Access and Driveways
12. A sealed access driveway must be provided from Witta Circle to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. a driveway crossover in accordance with Noosa Council’s standard drawings RS-
049, RS-050 and any associated addendum;
b. be generally in accordance with SCG Consulting’s Driveway & Access Plan
(32139-OW3.1) and Driveway Details Plan (32139-OW3.2) dated October 2022;
and
c. the construction of the driveway crossover must not create any trip hazards in
Council’s road reserve, any reshaping of Council’s road reserve is limited to a
maximum 1 in 10 grade and must be done so without the use of privately owned
retaining structures.
Stormwater Drainage
13. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval, be generally in accordance with SCG Consulting’s Preliminary
Stormwater Management Plan (32139-SW1.1) dated October 2022 and include in
particular:
a. a minimum 3,000 litres of rainwater storage and reused for non-portable purposes.
Easements
14. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
15. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
16. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
17. All earthworks and associated structures/batters must be undertaken in accordance with
an Operational Works approval and be generally in accordance with SCG Consulting’s
Preliminary Earthworks Plan (32139-OW2.1) dated October 2022. All earthworks and
associated structures/batters, both above and below ground level, both temporary and
permanent must be contained entirely within the subject site unless written permission
from the respective landowner(s) is provided to Council.
Page 3 of 5
Document Set ID: 22490088
Version: 4, Version Date: 07/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original