Original source · versioned page text
SUPERSEDED - Referral Agency Response - RAP22 0023 [As Published]
18. Prior to the issue of an Operational Works permit for Earthworks, an Acid Sulfate Soils
Assessment and Management Plan and a site-specific Dewatering Plan must be
prepared, submitted and accepted by Council. The Acid Sulfate Soil Assessment and
Management Plan and the Dewatering Plan must be prepared by a suitably qualified
person (RPEQ) and must include but not be limited to:
a. sufficient detail to demonstrate how acidic water encountered during excavation and
construction will be treated and disposed of; and
b. sufficient detail to demonstrate that the dewatering of the site will not impact on the
structural integrity of buildings and structures on adjoining properties.
19. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
20. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
4. REASONS FOR REFERRAL AGENCY’S DECISION
The proposal is subject to specific built form parameters outlined in The Noosa Plan.
5. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the referral agency conditions:
Development Compliance Inspection
1. Prior to the commencement of the use, please contact Council's Development
Assessment Branch to arrange a Development Compliance Inspection.
Infrastructure Charges
2. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue.
Fires in Urban Areas
3. In urban areas fires are prohibited except where in an appliance is used for domestic
heating or cooking purposes, which must comply with particular standards. Any area
identified as a fire pit area on approved plans is to be in accordance with Local Law &
Subordinate Local Law No. 3, Schedule 3. Refer to the following link for details:
Sustainability
4. Council encourages sustainable and energy efficient building design for all development.
including the use of sustainable building materials, energy efficient fittings, solar hot
water, photovoltaic systems (including the use of inverter/charges), solar panels, water
saving devices and rainwater harvesting.
Page 4 of 5
Document Set ID: 22490088
Version: 4, Version Date: 07/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original