Original source · versioned page text
Appendix 6 - Council Pre-lodgement Minutes 11.09.14 (00005274)
Attached to the e-mail MCU15/0053 Application Forms 1 & 5 and Town Planning Report - Multiple Dwellings Type 4 - Conventional at 30-32 Doonella Street Tewantin (1 email of of 3).
4. ADVICE & INFORMATION
Planning Officer Name – Denis Wallace
The proposal for a Multiple Housing - Type 4 unit development is an inconsistent Use within
the Community Service zone under the provisions of The Noosa Plan. An application for the
use would need to demonstrate sufficient grounds to overcome the conflict with the planning
scheme in accordance with S326(1)(b) of the Sustainable Planning Act.
In particular, the application would need to demonstrate that the land should not be retained
for community purposes. Preliminary advice from Council’s Strategic Planning unit indicates
that no additional community facilities have been identified or planned for the Tewantin CBD,
with the intent to continue to upgrade and strengthen the existing Tewantin Community
Centre at Ernest/Earl Streets.
Differences and changes from the previous development proposal presented at PLM13/0215
were discussed.
The owner’s again confirmed that the development is not proposed to be an NRAS or similar
recognised affordable housing scheme. It’s noted that the units are relatively small and likely
to garner broad support for housing product of this type in the locality.
The key technical provisions of the proposal are below, with a discussion provided further
below:
Criteria Planning Scheme Proposal Complies?
2
Site Area 2,539m
Population density Attached Housing – 100 per ha (25.39= 15 x 2 bed units and X
10 x 2 bed units) 6 x 1 bed units
Community Services – 160 per ha for = 46.2 persons
retirement & special needs (40.62= 16 x 2
bed units)
Business Centre - 100 per ha (25.39= 10
x 2 bed units)
2 2
Plot ratio* Attached Housing – 1,019m 2,026m = 0.79:1 X
2
Community Services – 1,625m
2
Business Centre - 1,764m
Site cover Attached Housing – 40% 32%
Community Services – None
Business Centre – None
2 2
Landscaping Minimum Area = Max pop x 40m = Approx. 1,200m X
2
Area 1,625m
Boundary setback Front – 6m 6m
Rear – 6m 7m
Building height
in storeys 2 storeys max 3 storeys x
in metres 8 metres max 8.5-10 metres x
Roof form
Roof Pitch 5 degrees 5 degrees
Eave overhangs 600mm to 75% 600mm to 75%
Carparking 2 bed unit = 1 per dwelling + 1 per 3 for 33
visitors; 1 bed unit = 1 per dwelling
Height – It should be noted that the maximum height limits for Tewantin’s adjacent Business
Centre zone is 2 storeys and 10m only. Council officers prefer that any 3 storey portion of the
development be limited to the rear of the site, limited in area, and a greater setback to the
upper level be provided to that currently shown on the proposal plan.
This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement
discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
applicants about Council’s policies for development. The recorded discussion items and outcomes in no way imply or commit to an
approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
development proposal have been raised / identified. When a formal development application is lodged, the proposal will be
assessed on its planning merits in accordance with Council’s policy framework existing at the time of the assessment.
FM6082/8-18/04/2013 Page 2 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix 6 - Council Pre-lodgement Minutes 11.09.14 (00005274).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.