Service Outputs – Detailed Activity Listing
Activity Service Level/Standard
- Video Counts (external provider)
Cycle Grant Preparation of Funding Grant
Activities Applications for cycling infrastructure. Annual preparation of funding grant applications
• Includes grants for planning, design (December / January).
and delivery of on-road facilities,
off-road pathways, data counters,
end of trip facilities, wayfinding
signage, etc.
• On-going Management of the Cycle Monthly progress reporting to TMR, plus weekly
Grant Program. internal progress meetings.
Reporting to TMR and internal
progress meetings.
Capital Works Development of future capital works As required dependent on traffic engineering
Planning projects: issues that arise and/or as input is required into
• Identification of existing civil design projects.
infrastructure deficiencies through
traffic investigations and
development of remedies.
Traffic modelling to inform:
• Future road / intersection
improvements
• Civil designs of existing capital
projects.
Civil design reviews:
• Review of traffic engineering aspects
of civil design proposal.
Reactive activities Issue Target days for completion
Heavy Vehicle Applications: 20 business days (target)
Assessment and approval (including
conditioning) or refusal of Freight and
Heavy Vehicle applications to use the
local road network.
(Statutory time limit of 28 days in
accordance with the National Heavy
Vehicle Law)
Events: Review & comment on traffic No defined target as each event varies in
engineering matters and road safety complexity, frequently undergoes changes, and is
issues associated with events, submitted at varying time frames ahead of the
including review of traffic management actual event commencing.
plans and traffic guidance schemes.
(This is an internal service to Property
Branch)3
Customer requests (minor): low risk 30 business days (target).
requiring limited engineering Investigation only. Time frame does not include
investigation and analysis. May time to deliver improvements on the ground as this
require preparation of correspondence, is dependent on external factors.
a minor sketch plan and work
instructions (e.g. basic line-marking /
signage changes).
Customer requests (moderate 60 business days (target)
complexity): moderate risk requiring Investigation only. Time frame does not include
greater engineering investigation and time to deliver improvements on the ground as this
analysis with input from other is dependent on external factors.
departments. May require preparation
of correspondence, detailed sketch
plans and detailed work instructions.
(e.g. changes to road geometry, car
parking, etc)
157 of 173
Page 361 of 392
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (190f110f82.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.