Service Outputs – Detailed Activity Listing
Activity Service Level/Standard
Customer requests (major complexity): higher Customer
risk requiring
requests (major
90 business
complexity):
days (target)
higher risk requiring
a higher level of engineering investigation aand
higher
analysis
levelwith
of engineering
Investigation
investigation
only. Time
andframe
analysis
does
with
no
input from internal and/or external departments.
input from
May internal and/or
to deliver
external
improvements
departments.on May
the ground
require reports, detailed correspondence, detailed
require reports,
plans, detailed
dependent
correspondence,
on externaldetailed
factors.plans,
work instructions, etc. (e.g. road safety, crash
workinvestigation,
instructions, etc. (e.g. road safety, crash investigation,
speed limit reviews, traffic noise assessment).
speed limit reviews, traffic noise assessment).
Customer requests specifically for 30 business days dependent on availability of
traffic count / speed data. existing data and whether new data is required to
be collected.
Programs
Initiatives aimed at managing congestion and reducing demand for increased capacity on the road network and car
parking through provision of active transport and public transport facilities and their promotion.
• Cycle Grant Program Annual preparation of funding grant applications
Scheduled On-going delivery of cycling (December / January) that assist Council to
activities infrastructure in collaboration with TMR achieve their overarching transport objects to
to create mode shift and reduce manage congestion and reduce demand for
dependence on private motor vehicle increased road capacity.
trips.
- Go Noosa Holidays • Free buses for entire length of Queensland
ProgramsServices: State School Easter & Xmas School holidays.
Includes Translink services 626, 627, 628,
629 and 632, and Council services 065 and
064.
• Traffic management
• Park and Ride
• Annual evaluation and reporting
• Go Noosa Weekends Free buses every weekend.
Includes Translink services 626, 627, 628, 629 and
632 only.
Annual evaluation.
Walk-and-Ride (Schools) Program At least one activity per term offered to all schools
Offer one activity per term such as: Annual evaluation and reporting on participation
• Year 4 Bike SkillsHigh school
bike tune-up day
• National Ride 2 School Day
• National Walk Safely to School
Day
• National Ride 2 Work Day
• Years 5 and 7 sustainable
transport in-class presentation
• Primary school in-class activities
such as follow the turkey to
school, hands-up surveys,
Comprises a range of activities & events
that are optional – subject to each
School’s decision.
Reactive activities Issue Target days for completion
• Ad hoc school requests such as As required
assistance for parking, kiss and drop
compliance, tailored programs such as
walking school buses etc.
• Enquiries / complaints No defined level of service – generally within 30
• In relation to Go Noosa programs etc. business days
1 Refer to Asset Responsibility Matrix for specific areas of responsibility
2 Currently no arrangements in place to recover costs associated with traffic engineering staff undertaking these
assessments on behalf of Property Branch. Arrangements need reviewing to ensure equitable.
158 of 173
Page 362 of 392
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (190f110f82.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.