Original source · versioned page text
Meeting papers
3 Currently no arrangements are in place to recover costs associated with traffic engineering staff undertaking detailed
assessments of Events on behalf of Council’s Property Branch. These engineering assessments take considerable
time. Cost recovery arrangements to be implemented.
159 of 173
Page 363 of 392
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (190f110f82.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.