Appendix 5 - Code Table Assessment
Attached to the e-mail MCU15/0061 Development Application - Appendix 4, 5, 6 & 7 Email 2 of 2.
Specific Outcomes Probable Solutions Compliance
g) changes to fauna habitat sited within a previously
and behaviour; and disturbed area of the road
h) disturbance of buildings reserve, south of an existing
clearing for aerial power lines
and features, including
and access.
natural features, of cultural
heritage significance. Whilst it is acknowledged
vegetation clearing is required
to establish the proposed
facility, due diligence and care
has been taken to ensure only
least concern vegetation is
required to be cleared.
Specifically Aurecon ecologists
undertook a flora and fauna
survey within a 100 m buffer of
the proposed clearing and
found that no EVNT fauna or
flora species would be impacted
upon during the establishment
of the facility (refer to Appendix
4).
The proposed facility will be
located away from wetland
systems and will unlikely impact
on the natural drainage or
cause erosion of the land.
Furthermore, the foundations
and earthworks are to follow
engineering design standards
and stormwater dissipation is
provided through the proposed
gravel compound finish. In
addition no buildings are
proposed and a
Telecommunication Facility is
not a habitable use, therefore
no effluent run off will occur.
The proposed facility will also
have restrictions to prevent
public access, including a
secured compound fence with a
locked gate and warning signs
placed around the facility.
NBN-4BBZ-4GYM-5125 – David Cootharaba Page 72