Original source · versioned page text
Appendix 5 - Code Table Assessment
Attached to the e-mail MCU15/0061 Development Application - Appendix 4, 5, 6 & 7 Email 2 of 2.
Specific Outcomes Probable Solutions Compliance
mechanical pumping are
used to achieve such
immunity; or
S7.5 Basements for non-
residential uses have flood
immunity above the Q100
that may be achieved by
means of mechanical
pumping where the
mechanical feature is
installed with adequate
holding tanks and an
alternative back up power
source.
Sense of arrival to Kin Kin No solution provided. O8 - Not Applicable.
O8 Uses, buildings, The proposed facility is not
structures and other works located within the township of
do not have an adverse Kin Kin.
effect on the visual
amenity of the entry points
to Kin Kin village, including
the sense of arrival to the
village
provided by—
a) the rural landscape
immediately prior to the
township;
b) the avenue of pine trees
along Pomona-Kin Kin Road;
c) the Main Street/Pomona-
Kin Kin Road junction; and
d) Sister Tree Creek Road.
Visual amenity in Boreen No solution provided. O9 – Not applicable.
Point village The proposed facility is not
O9 Uses, buildings, located within close proximity
structures and other works to Boreen Point village.
do not have an adverse Considering the large separation
impact upon— distances between the
a) views to Lake Cootharaba proposed facility and Lake
and beyond from roads and Cootharaba, Louis Bazzo Drive
NBN-4BBZ-4GYM-5125 – David Cootharaba Page 68
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.