Thursday, 24 March 2016 Our Ref: 15385 / Office: Sunshine Coast Council Ref: MCU16/0018 NOOSA COUNCIL PO BOX 141 TEWANTIN QLD 4565 ATTENTION: Glen Conforti Dear Glen INFORMATION RESPONSE DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE - MULTIPLE HOUSING TYPE 2 DUPLEX 9 DUKE STREET, SUNSHINE BEACH LOT 204 ON RP48113 Further to Council’s Information Request for the abovementioned proposal we now respond in full to each of the items raised. 1. Please provide an east west section through the entries between grids B and C with the NGL and 8m height line indicated. Response: Refer attached amended proposal plans prepared by Greg Gibbs Architects providing east west sections with natural ground level and 8m height line indicated demonstrating that the proposal remains below the required 8m height limit. 2. Please provide amended plans removing the gazebo from within the front setback and the fence articulated and setback sufficiently to allow for plantings within the site. Response: Refer attached amended proposal plans which provide for removal of the gazebo and lowering of the finished ground level of the front unit and outdoor private open space. As a result the private open space area and pool is largely at natural ground level. This enables the front fence to also be provided at natural ground level. While the fence is proposed as a solid 2m high fence to provide appropriate privacy to the open space area, the fencing is now setback and articulated to allow landscaping between the fence and front boundary. 3. Provide a preliminary engineering/geotechnical assessment that includes: (a) a plan that indicates the cut and fill to be carried out on the site (b) earth retaining methods for the building and during construction and, any proposed measures to ensure stability of adjacent properties and buildings.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
Response:
Refer attached engineering plans, slope stability assessment and soil test & footing report prepared by
SCG Consulting Engineers providing a plan indicating the proposed cut and fill on site, together with
retaining methods to ensure stability of adjacent properties and buildings.
4. Provide a stormwater drainage design or concept plan prepared by suitably qualified registered
engineer showing the proposed stormwater drainage and disposal strategy for the developed site
including the stormwater collection and disposal of the stormwater flows from the rear of the site,
the adjoining properties, the proposed driveway and impervious surfaces. The plan must comply
with the relevant standards and regulations and demonstrate that no adverse impact caused by
the development to the drainage conditions on other properties including during heavy rainfall
and in the event of the proposed system surcharges or its capacity being exceeded. Piped of
overland stormwater flows from other properties should be generally contained within a registered
easement and disposed of in an approved manner.
Response:
Refer attached engineering plans prepared by SCG Consulting Engineers providing a stormwater
management plan for the site development.
5. Provide a plan that shows vehicles manoeuvring patterns that demonstrate how a vehicle (B99)
enters each carpark space in a forward direction, reverses and turnarounds from the garages and
leaves the site in a forward direction safely (ie in a total of three manoeuvers). Amend layout plans
where necessary to achieve an acceptable outcome.
Response:
Refer attached engineering plans prepared by SCG Consulting Engineers providing a vehicle
manoeuvring plan demonstrating that appropriate manoeuvring can be achieved in to and out of the
garages.
The Information and Referral Stage of IDAS has now concluded and the application is now in the
Decision Stage.
Should you have any questions with respect to the above, please do not hesitate to contact me direct.
Yours faithfully
PROJECT URBAN
Scott Sobey
DIRECTOR
Email: [email protected]
Used in these records
15385_Council_Information Response_240316.pdfRelated documentApplication case desk ↗
About this file
- File size
- 132 KB (small file)
- File type
No other editions are linked here.