Response:
Refer attached engineering plans, slope stability assessment and soil test & footing report prepared by
SCG Consulting Engineers providing a plan indicating the proposed cut and fill on site, together with
retaining methods to ensure stability of adjacent properties and buildings.

4. Provide a stormwater drainage design or concept plan prepared by suitably qualified registered
    engineer showing the proposed stormwater drainage and disposal strategy for the developed site
    including the stormwater collection and disposal of the stormwater flows from the rear of the site,
    the adjoining properties, the proposed driveway and impervious surfaces. The plan must comply
    with the relevant standards and regulations and demonstrate that no adverse impact caused by
    the development to the drainage conditions on other properties including during heavy rainfall
    and in the event of the proposed system surcharges or its capacity being exceeded. Piped of
    overland stormwater flows from other properties should be generally contained within a registered
    easement and disposed of in an approved manner.

Response:
Refer attached engineering plans prepared by SCG Consulting Engineers providing a stormwater
management plan for the site development.

5. Provide a plan that shows vehicles manoeuvring patterns that demonstrate how a vehicle (B99)
    enters each carpark space in a forward direction, reverses and turnarounds from the garages and
    leaves the site in a forward direction safely (ie in a total of three manoeuvers). Amend layout plans
    where necessary to achieve an acceptable outcome.

Response:
Refer attached engineering plans prepared by SCG Consulting Engineers providing a vehicle
manoeuvring plan demonstrating that appropriate manoeuvring can be achieved in to and out of the
garages.


The Information and Referral Stage of IDAS has now concluded and the application is now in the
Decision Stage.


Should you have any questions with respect to the above, please do not hesitate to contact me direct.

Yours faithfully
PROJECT URBAN




Scott Sobey
DIRECTOR
Email: [email protected]

Used in these records

About this file

File size
132 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15385_Council_Information Response_240316.pdf · 132 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.