M2677- DN Change representations (Final)

Attached to the e-mail MCU20/0150 - representations.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

.




                                                                                               incomplete as a result of the
                                                                                               development staging. The temporary
                                                                                               turnaround facilities must be in
                                                                                               accordance with an Operational Works
                                                                                               approval and must be of sufficient size to
                                                                                               accommodate the 3-point turn
                                                                                               manoeuvre of a Waste Collection Vehicle
                                                                                               (WCV). The maintenance of the
                                                                                               turnaround facility is the responsibility of
                                                                                               the land owner.

                                                                                          4. For each stage the developable land must
                                                                                               be provided with a stormwater drainage
                                                                                               system connecting to a lawful point of
                                                                                               discharge. The works must be undertaken
                                                                                               in accordance with an approved Site
                                                                                               Based Stormwater Management Plan


We look forward to Council’s consideration of our change representations and receiving Council’s Negotiated Decision
Notice as soon as possible.

Should you require any clarification on any of the above issues please do not hesitate to contact our office.



Yours faithfully,




TIMOTHY BALCOMBE
SENIOR URBAN PLANNER
JFP URBAN CONSULTANTS

Attachments:

          Revised Site Plan (Staging Plan), Dwg No. 7189-DA02, prepared by Blackburne Jackson Architecture, dated 20-05-21




JFP Ref:                                                                                                                       Page 10
Log in to download the original file

M2677- DN Change representations (Final).pdf · 291 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.