M2677- DN Change representations (Final)
Attached to the e-mail MCU20/0150 - representations.
.
incomplete as a result of the
development staging. The temporary
turnaround facilities must be in
accordance with an Operational Works
approval and must be of sufficient size to
accommodate the 3-point turn
manoeuvre of a Waste Collection Vehicle
(WCV). The maintenance of the
turnaround facility is the responsibility of
the land owner.
4. For each stage the developable land must
be provided with a stormwater drainage
system connecting to a lawful point of
discharge. The works must be undertaken
in accordance with an approved Site
Based Stormwater Management Plan
We look forward to Council’s consideration of our change representations and receiving Council’s Negotiated Decision
Notice as soon as possible.
Should you require any clarification on any of the above issues please do not hesitate to contact our office.
Yours faithfully,
TIMOTHY BALCOMBE
SENIOR URBAN PLANNER
JFP URBAN CONSULTANTS
Attachments:
Revised Site Plan (Staging Plan), Dwg No. 7189-DA02, prepared by Blackburne Jackson Architecture, dated 20-05-21
JFP Ref: Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.