M2677- DN Change representations (Final)

Attached to the e-mail MCU20/0150 - representations.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

.




    55.                             This condition requires the site to be      Amend Condition 55 as follows:
    The site must be left clean     turfed if it remains vacant for more
    and tidy free from debris       than 30 days. The need to maintain the      The site must be left clean and tidy free from
    such as concrete, wire,         site in a tidy state is acknowledged.       debris such as concrete, wire, rubble, brick/s
    rubble, brick/s                 However, it is considered that it is        and the like. If the site or balance lot remains
    and the like. If the site       unreasonable condition to turf the          vacant for more than 30 days the lot/s must
    remains vacant for more         subject site.                               be turfed regularly mowed / slashed and
    than 30 days the lot/s must                                                 maintained in a tidy manner at all times or
    be turfed or                    Therefore, we suggest that the              landscaped in accordance with Planning
    landscaped in accordance        condition be softened as follows:           Scheme Policy PSP 2 – Landscaping and to the
    with Planning Scheme            “if the site is left vacant for more than   satisfaction of Council so as to not cause
    Policy PSP 2 – Landscaping      30 days, the site is to be regularly        nuisance to the surrounding area.
    and to the                      mowed/slashed and maintained in a
    satisfaction of Council so as   tidy manner at all times”.
    to not cause nuisance to
    the surrounding area.           The second part of the condition is no
                                    longer considered necessary.
    New Condition 3A, 3b, 3C        A stage plan has been prepared to           New staging conditions:
    and 3D is proposed to           support the staging of the
    reflect the potential staging   development.                                Staging
    of the Multiple dwelling
    units.                          Accordingly, it is requested that           1. The development may be staged in
                                    Council include the staging plan as part       accordance with the stage boundaries
                                    of the approved plans and include the          shown on the Approved Staging Plan
                                    proposed conditions relating to the            (Dwg No. DA02 09 Site Plan, Level 1
                                    following items:                               Ground). If staged, the development need
                                      Staging the development                     not be completed sequentially in the
                                      Sunset clause                               stage order indicated on the Approved
                                      Turnaround provisions                       Plans provided that any vehicle access,
                                      Stormwater management                       onsite manoeuvring, car parking and
                                                                                   infrastructure services required to service
                                                                                   the particular stage are constructed with
                                                                                   that stage.

                                                                                Sunset Clause

                                                                                2. Pursuant to s88 of the Planning Act 2016,
                                                                                   the uncompleted aspects of this
                                                                                   development approval lapse if the whole
                                                                                   of the approved use has not happened by
                                                                                   {insert day/month of negotiated decision}
                                                                                   of 2027

                                                                                Temporary turn around areas

                                                                                3. Temporary unsealed turnaround facility
                                                                                   must be constructed at the end of each
                                                                                   private driveway left temporarily




JFP Ref:                                                                                                             Page 9
Log in to download the original file

M2677- DN Change representations (Final).pdf · 291 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.